Proton Calorimetry/Meetings
Jump to navigation
Jump to search
Proton Calorimetry Meeting Minutes.
2024
18th September
Minutes for UCL Proton Beam Therapy Group Meetings, 4th September
Present
Joe Bateman, Sonia Escribano, Febian, Simon Jolly, Raffaella Radogna (via zoom)
Raffaella Radogna
- Pushing for masters student to complete analysis of SciFi monitor (but not with protons from Linear Beam)
- It is okay for measurement of the beam spot position through the centroid of the cluster
- Beam size measurements very sensitive to geometric variation between coupling between pixels and fibres - need to find a way to calibrate fibre response
- Pixel sharing between fibres due to pixel pitch
- Potential calibration method through shining collimated light onto each of the fibres
- Noticing reduced intensity on the central pixels
- Has travel money to use up before end of 2024 - plans to come to UCL.
- w/b of 28th October to look at SciFi tracker and discuss integrated design
- Possible second trip in December for beam test if new electronics and scintillator sheets are ready
Febian
- Upcoming CDT event on 24/10 to present a 2 minute presentation and poster
Joseph Bateman
Sonia Escribano
- Been preparing a talk for the Science Slam session at the DKFZ Medical Physics Summer School
- Suggestions for QuARC Calibration Issues:
- Compare the method Saad was using and the new method with the old shoot through files
- Check with the Manchester and PARTREC data
- To check up on status of scintillators and follow up with Harry & Martin
Simon Jolly
- Harry has been in charge of dealing with scintillator sheets but has been occupied by SuperNEMO
- Have rough cuts from nuvia - either go to Daytron high precision machinery or to someone who has one of these machines. Daytron can do better 10 um flatness
- Need Martin to machine the flatness
- Things needed to sort before next beam test:
- Oxford to do small changes to zmod board
- Pete Hastings have new ddc boards
- New scintillators for a full stack -
- If doing full QuADProBe test only need two stacks
- Plan for PTCOG Argentina Talk:
- Full 3D treatment plan MC reconstruction with log file data and QuADProBe measurements at Maastro and at PSI
- Unsure whether SciFi tracker will be available so will likely have to use Tony's CMOS sensor again if available.
- Aim for QuARC beam test before end of 2024 - at UCLH