Proton Calorimetry/Meetings/2018/01/24
Minutes for UCL Proton Calorimetry Meeting, 24th January 2018 (D17, Physics & Astronomy, UCL)
Present
Simon Jolly, Laurent Kelleter, Matthieu Hentz, Anastasia Basharina-Freshville, Jordan Silverman, Dan Walker
LK:
- Investigating image acquisition for Nikon camera:
- Using SJ liquid scintillator image to test reconstruction.
- Integrating single column of pixels to get 1D curve.
- Gets an approximate Bragg curve from integrated signal but reflections in image make curve poor.
- To Do:
- Computer upgraded to Centos7: fit doesn't work any more (ROOT integrator fails).
- Find a way to deal with very different scintillator slice thicknesses
- Data format of ISDI sensor?
- Make everything more smooth and ready-to-use for users
- Make sure camera hardware is set up ready for DAQ.
JS:
- Making measurements of scintillator sheet thickness:
- 3 mm sheets are closer to 2.75 mm but variation is mostly below 100 microns.
- 2 mm sheets have 2 groupings:
- 2.0 mm group has better flatness than 2.6 mm group.
- Also been playing around with Clatterbridge simulations:
- Tried running on Centos7.
- Will go back to SL6 as it actually works properly...
- To Do:
- Split up 2 mm sheet results into the 2 groups.
- Meeting with Matthieu on Clatterbridge simulations.
- Get them running on SL6.
DW:
- Investigating negative integrated waveforms form LeCroy binary files:
- One bad pulse comes from small tail in leading pulse region.
- Reducing standard deviation for this region cuts out bad pulse.
- Put up instructions on LeCroy binary file conversion for Tony Price on PBTWiki.
- To Do:
- Adding integration window to get spectrum to match Caen ADC data.
- Badger Tony Price for tracker files.
ABF:
- Writing paper: finish off plots and majority of writing.
- Painting scintillator sheets:
- Both paints look good so far.
- Will check on Monday for painting all sheets.
- Final version of 3 month plan requested by SJ:
- Will include notes from previous meetings and circulate.
- Will not include any details of final plans for beam tests: waiting for discussion with Ruben Saakyan.
- SJ strongly objected to choice not to decide on complete schedule in advance, but left choice to ABF.
- SJ requested to be involved in meeting with RS regarding final beam schedule.
- To Do:
- Complete main draft of schedule (but NOT including requirements for beam tests).
- Painting scintillator.
- First draft by next week.
MH:
- Finished all first term exams and coursework.
- Second term courses starting to bear fruit! But needs to learn background mathematics...
- Will attend proton imaging workshop in Lyon, 14–15 June.
- Currently compiling Geant4 on Virtual Machine on new MacBook.
- To Do:
- Meeting with Jordan on Wednesday.
- Buffering of readout in Geant4.