== Minutes for UCL Proton Beam Therapy Group Meetings, 4th September ==
=== Present ===
'''Joe Bateman''', '''Sonia Escribano''', '''Febian''', '''Simon Jolly''', '''Raffaella Radogna (via zoom) '''
=== [[ELogs/RaffaellaRadogna|Raffaella Radogna]] ===
* Pushing for masters student to complete analysis of SciFi monitor (but not with protons from Linear Beam)
* It is okay for measurement of the beam spot position through the centroid of the cluster
* Beam size measurements very sensitive to geometric variation between coupling between pixels and fibres - need to find a way to calibrate fibre response
** Pixel sharing between fibres due to pixel pitch
* Potential calibration method through shining collimated light onto each of the fibres
* Noticing reduced intensity on the central pixels
* Has travel money to use up before end of 2024 - plans to come to UCL.
** w/b of 28th October to look at SciFi tracker and discuss integrated design
** Possible second trip in December for beam test if new electronics and scintillator sheets are ready
=== [[ELogs/Febian|Febian]] ===
* Upcoming CDT event on 24/10 to present a 2 minute presentation and poster
=== [[ELogs/JosephBateman|Joseph Bateman]] ===
=== [[ELogs/SoniaEscribano|Sonia Escribano]] ===
* Been preparing a talk for the Science Slam session at the DKFZ Medical Physics Summer School
* Suggestions for QuARC Calibration Issues:
** Compare the method Saad was using and the new method with the old shoot through files
** Check with the Manchester and PARTREC data
* To check up on status of scintillators and follow up with Harry & Martin
=== [[ELogs/SimonJolly|Simon Jolly]] ===
* Harry has been in charge of dealing with scintillator sheets but has been occupied by SuperNEMO
* Have rough cuts from nuvia - either go to Daytron high precision machinery or to someone who has one of these machines. Daytron can do better 10 um flatness
* Need Martin to machine the flatness
* Things needed to sort before next beam test:
** Oxford to do small changes to zmod board
** Pete Hastings have new ddc boards
** New scintillators for a full stack -
** If doing full QuADProBe test only need two stacks
* Plan for PTCOG Argentina Talk:
** Full 3D treatment plan MC reconstruction with log file data and QuADProBe measurements at Maastro and at PSI
** Unsure whether SciFi tracker will be available so will likely have to use Tony's CMOS sensor again if available.
* Aim for QuARC beam test before end of 2024 - at UCLH


=== [[/2024/09/04|4th September]]===
=== [[/2024/09/04|4th September]]===

Revision as of 14:00, 18 September 2024

Proton Calorimetry Meeting Minutes.

2024

18th September

Minutes for UCL Proton Beam Therapy Group Meetings, 4th September

Present

Joe Bateman, Sonia Escribano, Febian, Simon Jolly, Raffaella Radogna (via zoom)


Raffaella Radogna

  • Pushing for masters student to complete analysis of SciFi monitor (but not with protons from Linear Beam)
  • It is okay for measurement of the beam spot position through the centroid of the cluster
  • Beam size measurements very sensitive to geometric variation between coupling between pixels and fibres - need to find a way to calibrate fibre response
    • Pixel sharing between fibres due to pixel pitch
  • Potential calibration method through shining collimated light onto each of the fibres
  • Noticing reduced intensity on the central pixels
  • Has travel money to use up before end of 2024 - plans to come to UCL.
    • w/b of 28th October to look at SciFi tracker and discuss integrated design
    • Possible second trip in December for beam test if new electronics and scintillator sheets are ready

Febian

  • Upcoming CDT event on 24/10 to present a 2 minute presentation and poster


Joseph Bateman

Sonia Escribano

  • Been preparing a talk for the Science Slam session at the DKFZ Medical Physics Summer School
  • Suggestions for QuARC Calibration Issues:
    • Compare the method Saad was using and the new method with the old shoot through files
    • Check with the Manchester and PARTREC data
  • To check up on status of scintillators and follow up with Harry & Martin

Simon Jolly

  • Harry has been in charge of dealing with scintillator sheets but has been occupied by SuperNEMO
  • Have rough cuts from nuvia - either go to Daytron high precision machinery or to someone who has one of these machines. Daytron can do better 10 um flatness
  • Need Martin to machine the flatness
  • Things needed to sort before next beam test:
    • Oxford to do small changes to zmod board
    • Pete Hastings have new ddc boards
    • New scintillators for a full stack -
    • If doing full QuADProBe test only need two stacks
  • Plan for PTCOG Argentina Talk:
    • Full 3D treatment plan MC reconstruction with log file data and QuADProBe measurements at Maastro and at PSI
    • Unsure whether SciFi tracker will be available so will likely have to use Tony's CMOS sensor again if available.
  • Aim for QuARC beam test before end of 2024 - at UCLH

4th September

21st August

7th August

31st July

24th July

17th July

2023

15th March

1st March

22nd February

15th February

8th February

1st February

25th January

18th January

11th January

2022

7th December

23rd November

16th November

9th November

2nd November

20th October

5th October

28th September

21st September

14th September

7th September

24th August

17th August

10th August

3rd August

27th July

22nd June

15th June

8th June

11th May

4th May

27th April

21st April

12th April

7th April

30th March

16th March

2nd March

9th February

2nd February

26th January

19th January

12th January

2021

15th December

8th December

24th November

17th November

10th November

3rd November

26th October

20th October

13th October

6th October

29th September

22nd September

15th September

7th September

28th July

9th July

2nd July

23rd June

16th June

26th May

12th May

28th April

21st April

14th April

31st March

24th March

17th March

10th March

3rd March

22nd February

17th February

10th February

3rd February

27th January

20th January

13th January

6th January

2020

16th December

9th December

2nd December

25th November

18th November

11th November

4th November

21st October

7th October

23rd September

16th September

9th September

2nd September

26th August

19th August

12th August

5th August

29th July

22nd July

15th July

8th July

1st July

24th June

17th June

9th June

3rd June

27th May

20th May

13th May

6th May

29th April

22nd April

15th April

24th February

17th February

28th January

7th January

2019

10th December

26th November

12th November

29th October

8th October

4th October

6th March

27th February

13th February

6th February

30th January

23rd January

16th January

9th January

2018

28th November

14th November

7th November

24th October

17th October

10th October

3rd October

5th September

29th August

22nd August

15th August

30th May

14th March

7th March

28th February

14th February

7th February

31st January

25th January with ISDI

24th January

17th January

10th January

2017

13th December

6th December

29nd November

22nd November

15th November

18th October

11th October

4th October

27th September

20th September

23rd August

16th August

18th July

5th July

21st June

31st May

24th May

11th May

28th April (Proton dose build-up: Adam Gibson)

29th March

22nd March

15th March

8th March

22nd February

15th February

8th February

1st February

25th January

11th January

2016

14th December

30th November

23rd November

16th November

9th November

2nd November

12th October

5th October

15th September