Proton Calorimetry/Meetings/2025/04/01

From PBTWiki
Jump to navigation Jump to search

Minutes for UCL Proton Beam Therapy Group Meetings, 1st April

Present

Joe Bateman, Sonia Escribano, Matt Warren, Harry Barnett, Simon Jolly

Matt Warren

  • String of 8 DDC boards seems to work but only if integration is greater than 600 otherwise overlaps - so need to find ways to make faster

Simon Jolly

  • Prague PTC planned measurements
    • Shoot through calibrations
    • Pristine Bragg peaks
    • SOBP treatment plan
    • WET measurement at same time as shoot through calibrations
    • Moving couch to ensure perfectly straight beams at different lateral positions
    • 30,000 measurements ~ 5 secs for pristine Bragg peaks


Sonia Escribano

  • To-do list prepared for Prague
  • Fake-generated data to check “live acquisition” calibration and firing
  • For long runs not possible to kill acquisition from GUI (I.e. stop button stops calibration and fitting) - need to access to ftdi from GUI which is blocked by web servers
  • On patch panel of Peli case in case pi’s don’t work and need to use DAQ laptop