Minutes for UCL Proton Beam Therapy Group Meetings, 9th October

Present

Joe Bateman, Sonia Escribano, Simon Jolly, Raffaella Radogna (via zoom) , , Andreas Korn (via zoom)

Raffaella Radogna

  • Arrives on Sun 27th - will be around on UCL from Monday with fibre setup
  • New equipment for second setup will be arriving in Bari soon
  • Will need 20-25cm prior to QuARC
  • Hole on optical board for cables to pass through
  • Use trolly with optical board


Sonia Escribano

  • Mismatch between root and macOS when looking at fitting code
  • In code, issue with position - definition of centre of sheets - works well for one module - but when using two modules becomes issue - assumes separation is 1.5 mm instead of 3 mm
    • Accounting for this reduces the 1.5 mm offset
    • Constant observed offset is removed if start counting at 3mm rather than 0 mm
    • Will check with other sets of data
  • Currently debugging the code
    • Sheet positions pulled from file with sheet thicknesses on it - may need to update and simplify for future production - maybe put into .json file?
  • Future experiment - updated QuARC (with new scintillators and improved electronics) UCLH before Xmas to do list:
    • No news from Martin
    • Harry visiting Datron but no news yet - ask Harry
    • Need to test electronics
    • Lab testing with DAQ laptops and GUI should be done
      • Even if scintillators aren't ready should do with photodiodes and code
      • Sonia to take charge of this
    • In terms of DAQ and GUI
      • Gui needs testing with new fpga and electronics - need whole. Module to test
      • Live visualisation: Live data and then at end of live data see the fit -- Live data readout - one fit to all data - then trigger post processing -- Live data readout - one fit to all data - then trigger post processing
      • Postprocessing - currently two codes calibration & fit oof avg measurement


Simon Jolly

  • For fitting - have single calibration file per module as opposed to two (one per shoot through for each direction) ?
  • How to include errors in the fitting - I.e. put large errors on sheets with less accurate value to influence fit less
  • Goal of new QuARC test to tests new electronics Daisy chain with usb-c and double sided photodiodes
    • 4 modules with 8 boards to do immediate measurements i.e. daisy-chaining 8 modules
    • But only need online readout of 4
    • To test scanning beam position and how this can reconstruct the Bragg peak and compare to simulated beam
    • New good sheets from harry, in newly designed scintillator sheet holders mounted into a newly cut peli-case
    • Testing new ddc boards and usb 104 chain
    • As well as checking light output with existing fpga code on new ddc boards to ensure fpga code on new boards
    • Sending for new ddc and new mod boards to be produced
    • Maybe still have beam test with new scintillator and old ddc boards etc
  • Can maybe acquire with fibres ? Since fibre DAQ is independent currently ?