Proton Calorimetry/Experimental Runs/2025/Trento 2025-03

From PBTWiki
Jump to navigation Jump to search

Experiment Equipment

Item Notes
Network Hub Set in control room to take output from experimental room ethernet connection. Control laptops connected via 5GHz WiFi.
Control Laptop x2 1 for remote control of FPGA, 1 for notes/web GUI.
Ethernet Cable x 2 To connect DAQ laptop to network in the experimental room, control laptop to network in control room.
Portable Enclosure
Scintillator stacks
DAQ laptop x1 Control photodiode acquisition.
Nexys Video FPGA development board. For interfacing between DDC232 and PC.

Schematic

UCL_Setup.png

Experiment Plan

  1. Set up mains cabling and networking in treatment and control rooms.
  2. Install Peli case on treatment couch.
  3. Calibration shoot-through measurements of 4 rev. D modules: either rotating case or modules for back shoot-through.
  4. Pristine Bragg peak measurements at clinical current for full clinical range.
  5. FLASH measurements at 245 MeV.