Beam Time Request Forms
https://www.hep.ucl.ac.uk/pbt/wikiData/BeamRequests/Trento_09_2025/
Experiment Equipment
Item
|
Notes
|
Network Hub
|
Set in control room to take output from experimental room ethernet connection. Control laptops connected via 5GHz WiFi.
|
Control Laptop x2
|
1 for remote control of FPGA, 1 for notes/web GUI.
|
Ethernet Cable x 2
|
To connect DAQ laptop to network in the experimental room, control laptop to network in control room.
|
Portable Enclosure
|
|
Scintillator stacks
|
4 Modules (to cover the full clinical range, from 60 to 250 MeV)
|
Scintillating fibers module
|
1 2D Module
|
DAQ laptop x1
|
Control photodiode acquisition.
|
Nexys Video FPGA development board.
|
For interfacing between DDC232 and PC.
|
Schematic
Fiber Module Experiment Equipment
Item
|
Notes
|
2D Fiber Arrays
|
2 Modules of vertical and horizontal fibers
|
Read-out electronics
|
2 Hamamatsu S13885-128 photodiode array each coupled to a Hamamatsu C9118-02 driver circuit
|
ZYBO Z7-10 Diligent FPGA development board.
|
To provide clocks to C9118.
|
NI USB-6366 Multifunction I/O device.
|
For interfacing between C9118 and PC.
|
DAQ laptop x1
|
Control photodiode acquisition.
|
Experiment Plan
For each beam delivery, our acquisition time is 5 seconds. This gives us an optimal number of events. For FLASH beam time restrictions, we could consider reducing the acquisition time, if necessary.
- Set up mains cabling and networking in treatment and control rooms.
- Install Peli case on treatment couch.
- Background
- Calibration shoot-through measurements of 4 stack modules: either rotating case or modules for back shoot-through:
- 8 beam deliveries 245 MeV conventional current (2 beam deliveries (back and forth) per each module)
- additional 2 or 3 beam deliveries 245 MeV at conventional current might be needed to find the minimum DDC232 FSR that does not saturate the signal.
- 8 beam deliveries 245 MeV FLASH current (2 beam deliveries (back and forth) per each module)
- additional 2 or 3 beam deliveries 245 MeV at FLASH current might be needed to find the minimum DDC232 FSR that does not saturate the signal.
- Pristine Bragg peak measurements at clinical current for full clinical range:
- 19 beam deliveries from 245 MeV and 240 to 70 MeV in 10 MeV steps.
- Pristine Bragg peak measurements at FLASH current for full clinical range:
- 19 beam deliveries from 245 MeV and from 240 to 70 MeV in 10 MeV steps at FLASH current.
- if there is FLASH beam time limitation we can take less energies points. Moreover, we could reduced the acquisition time for each FLASH beam delivery.
- Spot scanning:
- pristine Bragg Peak measurements at fixed energy (i.e. 150 MeV and 245 MeV) and clinical current shifting the beam up, down, left and right wrt isocenter by 3mm
- 4 beam deliveries per energy
Setup
- Peli case set up on FLASH station.
- Network connected through TIFPA experimental room patch panel:
- Inside experimental room:
- Long cable from patch panel (1) to DLink switch.
- Long cable from switch to QuARC.
- Short cable from switch to profile monitor DAQ laptop.
- Inside control room:
- Long cable from patch panel (5) to GL.iNet Slate router.
- Short cables to laptops.
- Case aligned to room lasers:
- Blocks used for levelling.
- Set up on height adjustable platform.
- Aligned to front cover plate.
Measurements 29/09/2025
- Approximately 100 minutes running 29/09/2025 (20:50–22:30).
- Peli case set up without movable stage: 1cm block under front, ~3mm under rear to level case.
- Isocentre at upstream face of first stack (level with inner edge of wheel mounts).
- Alignment checked with in room lasers after each adjustment.
- Beam optics are different between CONV mode and FLASH mode:
- Other than FLASH shoot through measurement with stack 1, running restricted to CONV mode.
- Current sufficient at maximum ion source current to almost saturate QuARC).
- SciFi monitor not installed.
Calibration conventional and FLASH
Run number
|
Modules
|
Beam Energy (MeV)
|
Estimated Range (mm)
|
Ion Source Current (nA)
|
Delivered protons
|
Irradiation time
|
Spot size (mm, FWHM)
|
DDC232 FSR (pC)
|
DDC232 Integration Time (us)
|
Acquisition Time (s)
|
Degrader WET (mm)
|
Beam setup
|
Comments
|
Photodiode QB Fit
|
Replay Fit
|
1 |
1, 2, 3 |
Background |
|
0 |
0 |
0 |
N/A |
12.5 |
220 |
3 |
0 |
Background |
Lid open |
|
|
2 |
1 |
Background |
N/A |
0 |
0 |
0 |
N/A |
12.5 |
170 |
3 |
0 |
Background |
Lid open |
|
|
3 |
1 |
Background |
N/A |
0 |
0 |
0 |
N/A |
12.5 |
170 |
3 |
0 |
Background |
Lid open, added network switch to DAQ chain |
|
|
4 |
1 |
Background |
N/A |
0 |
0 |
0 |
N/A |
12.5 |
170 |
3 |
0 |
Background |
Lid closed, BG with lid open ~0.10pC per PD, lid closed ~0.014pC |
|
|
5 |
1 |
Background |
N/A |
0 |
0 |
0 |
N/A |
12.5 |
170 |
3 |
0 |
Background |
Lid open, Added long network cable between switch and wall patch panel |
|
|
6 |
1 |
Background |
N/A |
0 |
0 |
0 |
N/A |
12.5 |
170 |
3 |
0 |
Background |
Lid closed, Peli case moved to FLASH beamline station and aligned with lasers @15.13 |
|
|
7 |
1 |
Background |
N/A |
0 |
0 |
0 |
N/A |
12.5 |
170 |
5 |
50 |
Background |
Peli case aligned, cover plates removed, 50mm WET installed |
|
|
8 |
1 |
228 |
325 |
- |
- |
- |
6.8 |
12.5 |
170 |
5 |
50 |
FLASH, low current, shoot through front |
Only 50% of measurements acquired, saturating; aiming for 1nA at detector |
|
|
9 |
1 |
228 |
325 |
- |
- |
- |
6.8 |
12.5 |
170 |
5 |
50 |
FLASH, low current, shoot through front |
4 sheets saturating; aiming for 0.5nA at detector |
|
|
10 |
1 |
228 |
325 |
- |
- |
- |
6.8 |
12.5 |
170 |
5 |
50 |
FLASH, low current, shoot through front |
Sheets saturating; aiming for 0.5nA at detector; switching to CONV optics |
|
|
11 |
1 |
228 |
325 |
10 |
4E9 |
- |
6.8 |
12.5 |
170 |
5 |
50 |
CONV, high current, shoot through front |
Switch to CONV mode, good FSR |
|
|
12 |
1 |
228 |
325 |
20 |
- |
- |
6.8 |
350 |
170 |
5 |
50 |
CONV, high current, shoot through front |
~20nA isocentre, ~120pC per sheet maximum |
|
|
13 |
1 |
228 |
325 |
- |
3E12 |
- |
6.8 |
350 |
170 |
3 |
50 |
CONV, high current, shoot through front |
~50nA isocentre, ~270pC per sheet maximum, Raspberry Pi frozen, restarted: only ~58% measurements recorded |
|
|
14 |
1 |
Background |
N/A |
0 |
0 |
0 |
N/A |
12.5 |
170 |
3 |
50 |
Background |
Lid closed, stack rotated |
|
|
15 |
1 |
228 |
325 |
10 |
4E9(?) |
- |
6.8 |
12.5 |
170 |
5 |
50 |
CONV, shoot through back |
~1nA isocentre(?) |
|
|
16 |
2 |
Background |
N/A |
0 |
0 |
0 |
N/A |
12.5 |
170 |
5 |
50 |
Background |
Lid closed, module 2 installed |
|
|
17 |
2 |
228 |
325 |
1 |
- |
- |
6.8 |
12.5 |
170 |
5 |
50 |
Shoot through front |
|
|
|
18 |
2 |
228 |
325 |
1 |
- |
- |
6.8 |
12.5 |
170 |
5 |
50 |
Shoot through back |
Rotated and reinstalled stack |
|
|
19 |
3 |
Background |
N/A |
0 |
0 |
0 |
N/A |
12.5 |
170 |
5 |
50 |
Background |
Lid closed, module 3 installed |
|
|
20 |
3 |
228 |
325 |
1 |
- |
- |
6.8 |
12.5 |
170 |
5 |
50 |
Shoot through front |
|
|
|
21 |
3 |
228 |
325 |
1 |
- |
- |
6.8 |
12.5 |
170 |
5 |
50 |
Shoot through back |
Rotated and reinstalled stack |
|
|
Bragg Peak Measurements
Run number
|
Modules
|
Beam Energy (MeV)
|
Estimated Range (mm)
|
Ion Source Current (nA)
|
Delivered protons
|
Irradiation time
|
Spot size (mm, FWHM)
|
DDC232 FSR (pC)
|
DDC232 Integration Time (us)
|
Acquisition Time (s)
|
Degrader WET (mm)
|
Beam setup
|
Comments
|
Photodiode QB Fit
|
Replay Fit
|
22 |
1, 2, 3 |
Background |
|
0 |
0 |
0 |
N/A |
12.5 |
220 |
5 |
0 |
Background |
Lid open, 3 modules installed |
|
|
23 |
1, 2, 3 |
Background |
|
0 |
0 |
0 |
N/A |
12.5 |
220 |
5 |
0 |
Background |
Lid closed, 3 modules installed |
|
|
24 |
1, 2, 3 |
179 |
215 |
1 |
1.3E11 |
20 |
8.7 |
12.5 |
220 |
5 |
0 |
CONV full energy |
4 photodiodes saturating: drop next current in half, 1.3E11 in 20s |
|
|
25 |
1, 2, 3 |
179 |
215 |
15nA |
- |
- |
8.7 |
12.5 |
220 |
5 |
0 |
CONV full energy |
15nA ion source current, ~1nA isocentre |
|
|
26 |
1, 2, 3 |
179 |
215 |
300nA |
- |
- |
8.7 |
350 |
220 |
3 |
0 |
CONV full energy, high current |
300nA ion source current, ~10nA isocentre |
|
|
27 |
1, 2, 3 |
179 |
215 |
250nA |
- |
- |
8.7 |
350 |
220 |
3 |
0 |
CONV full energy, high current |
250nA ion source current, ~8.3nA isocentre |
|
|
28 |
1, 2, 3 |
179 |
215 |
200nA |
- |
- |
8.7 |
350 |
220 |
3 |
0 |
CONV full energy, high current |
200nA ion source current, ~6.7nA isocentre |
|
|
29 |
1, 2, 3 |
179 |
215 |
150nA |
- |
- |
8.7 |
350 |
220 |
3 |
0 |
CONV full energy, high current |
150nA ion source current, ~5nA isocentre |
|
|
30 |
1, 2, 3 |
179 |
215 |
100nA |
- |
- |
8.7 |
350 |
220 |
3 |
0 |
CONV full energy, high current |
100nA ion source current, ~3.3nA isocentre |
|
|
31 |
1, 2, 3 |
Background |
|
0 |
0 |
0 |
N/A |
350 |
220 |
3 |
0 |
Background |
|
|
|
32 |
1, 2, 3 |
179 |
215 |
60nA |
- |
- |
8.7 |
50 |
220 |
3 |
0 |
CONV full energy, high current |
60nA ion source current, had to retake |
|
|
33 |
1, 2, 3 |
179 |
215 |
80nA |
- |
- |
8.7 |
100 |
220 |
3 |
0 |
CONV full energy, high current |
80nA ion source current, out of sequence, max 45pC per channel |
|
|
34 |
1, 2, 3 |
179 |
215 |
60nA |
- |
- |
8.7 |
50 |
220 |
3 |
0 |
CONV full energy, high current |
60nA ion source current, had to retake |
|
|
34 Full Stack (1-2-3, 6 boards) 179 215 8.7 50 220 3 17,647 FLASH-ish beam 40nA ion source current
35 Full Stack (1-2-3, 6 boards) 179 215 8.7 50 220 3 17,647 FLASH-ish beam 20nA ion source current
36 Full Stack (1-2-3, 6 boards) 148 155 10.6 350 220 3 17,647 FLASH-ish beam 300nA ion source current
37 Full Stack (1-2-3, 6 boards) 112 95 13.3 350 220 3 17,647 FLASH-ish beam 300nA ion source current
38 Full Stack (1-2-3, 6 boards) 70 41 16.2 350 220 3 17,647 FLASH-ish beam 300nA ion source current
39 Full Stack (1-2-3, 6 boards) Background - - - 350 220 3 17,647 Lid closed Background
40 Full Stack (1-2-3, 6 boards) Background - - - 12.5 220 3 17,647 Lid closed Background
Measurements 30/09/2025
- Approximately 100 minutes running 29/09/2025 (20:50–22:30).
- Peli case set up without movable stage: 1cm block under front, ~3mm under rear to level case.
- Isocentre at upstream face of first stack (level with inner edge of wheel mounts).
- Alignment checked with in room lasers after each adjustment.
- Beam optics are different between CONV mode and FLASH mode:
- Other than FLASH shoot through measurement with stack 1, running restricted to CONV mode.
- Current sufficient at maximum ion source current to almost saturate QuARC).
- SciFi monitor not installed.
Spot scanning Measurements
Run number
|
Detector
|
Beam Energy (MeV)
|
Estimated Range (mm)
|
Current (nominal) (nA)
|
Spot size (mm, FWHM)
|
DDC232 FSR (pC)
|
DDC232 Integration Time (us)
|
Degrader WET (mm)
|
Comments
|
Photodiode QB Fit
|
Replay Fit
|
n |
Full Stack |
245 MeV |
- |
- |
N/A |
12.5 |
170 |
|
top |
N/A |
|
n |
Full Stack |
245 MeV |
- |
- |
N/A |
12.5 |
170 |
|
bottom |
N/A |
|
n |
Full Stack |
245 MeV |
- |
- |
N/A |
12.5 |
170 |
|
left |
N/A |
|
n |
Full Stack |
245 MeV |
- |
- |
N/A |
12.5 |
170 |
|
right |
N/A |
|
n |
Full Stack |
150 MeV |
- |
- |
N/A |
12.5 |
170 |
|
top |
N/A |
|
n |
Full Stack |
150 MeV |
- |
- |
N/A |
12.5 |
170 |
|
bottom |
N/A |
|
n |
Full Stack |
150 MeV |
- |
- |
N/A |
12.5 |
170 |
|
left |
N/A |
|
n |
Full Stack |
150 MeV |
- |
- |
N/A |
12.5 |
170 |
|
right |
N/A |
|