Experiment Equipment
Item
|
Notes
|
Network Hub
|
Set in control room to take output from experimental room ethernet connection. Control laptops connected via 5GHz WiFi.
|
Control Laptop x2
|
1 for remote control of FPGA, 1 for notes/web GUI.
|
Ethernet Cable x 2
|
To connect DAQ laptop to network in the experimental room, control laptop to network in control room.
|
Portable Enclosure
|
|
Scintillator stacks
|
4 Modules (to cover the full clinical range, from 60 to 250 MeV)
|
Scintillating fibers module
|
1 2D Module
|
DAQ laptop x1
|
Control photodiode acquisition.
|
Nexys Video FPGA development board.
|
For interfacing between DDC232 and PC.
|
Schematic
Experiment Plan
- Set up mains cabling and networking in treatment and control rooms.
- Install Peli case on treatment couch.
- Background
- Calibration shoot-through measurements of 4 stack modules: either rotating case or modules for back shoot-through.
- 8 beam deliveries (2 beam deliveries (back and forth) per each module):
- Pristine Bragg peak measurements at clinical current for full clinical range.
- FLASH measurements at 245 MeV.
Calibration FLASH
DDC232 FSR should be determined at max beam current starting from minimum FSR value that does not give signal saturation. This could require 2 or 3 beam deliveries.
Run number
|
Detector
|
Beam Energy (MeV)
|
Estimated Range (mm)
|
Current (nA)
|
Spot size (mm, FWHM)
|
DDC232 FSR (pC)
|
DDC232 Integration Time (us)
|
Degrader WET (mm)
|
Comments
|
Photodiode QB Fit
|
Replay Fit
|
n |
Stack 1 |
245 MeV |
|
max |
|
min FSR that does not saturate the signal |
170 |
|
Shoot through front |
N/A |
|
n |
Stack 1 |
245 MeV |
|
max |
|
min FSR that does not saturate the signal |
170 |
|
Shoot through back |
N/A |
|
n |
Stack 1 |
Background |
|
- |
N/A |
- |
170 |
|
|
N/A |
|
n |
Stack 2 |
245 MeV |
|
max |
|
min FSR that does not saturate the signal |
170 |
|
Shoot through front |
N/A |
|
n |
Stack 2 |
245 MeV |
|
max |
|
min FSR that does not saturate the signal |
170 |
|
Shoot through back |
N/A |
|
n |
Stack 2 |
Background |
|
- |
N/A |
- |
170 |
|
|
N/A |
|
n |
Stack 3 |
245 MeV |
|
max |
|
min FSR that does not saturate the signal |
170 |
|
Shoot through front |
N/A |
|
n |
Stack 3 |
245 MeV |
|
max |
|
min FSR that does not saturate the signal |
170 |
|
Shoot through back |
N/A |
|
n |
Stack 3 |
Background |
|
- |
N/A |
- |
170 |
|
|
N/A |
|
n |
Stack 4 |
245 MeV |
|
max |
|
min FSR that does not saturate the signal |
170 |
|
Shoot through front |
N/A |
|
n |
Stack 4 |
245 MeV |
|
max |
|
min FSR that does not saturate the signal |
170 |
|
Shoot through back |
N/A |
|
n |
Stack 4 |
Background |
|
- |
N/A |
- |
170 |
|
|
N/A |
|