ELogs/SimonJolly: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 13: Line 13:


* '''QuARC''' improvements:
* '''QuARC''' improvements:
*# Updates to Peli case enclosure from '''Harry Barnett''': see [[ELogs/MechanicalEngineering|Mech Eng eLog]].
*# Updates to Peli case enclosure from '''Harry Barnett''': see [[ELogs/MechanicalEngineering#To_Do|Mech Eng eLog]].
*# Power distribution board, 2.5mm photodiode array readout and 1.5mm photodiode array Clatterbridge module from '''Pete Hastings (Oxford)''': see [[ELogs/Electronics#Oxford]].
*# Optimise speed of web GUI: replace PapaParse with direct XHR?
 
* Front-end electronics for QuADProBe SciFi:
* Front-end electronics for QuADProBe SciFi:
** Confirm  
** Confirm  
* Modify FMC daughterboard design with ZMOD connector — '''Pete Hastings (Oxford)/Andy Rose (Imperial)/Matt Warren'''.
* Shrink board to accept 2.5mm photodiode arrays plus 1.5mm sheet spacing for Clatterbridge.
* Update mechanical design of scintillator stack holder:
* Update mechanical design of scintillator stack holder:
** Move to 4-sided readout.
** Move to 4-sided readout.
** Use BPM-like reconstruction for QuARC position measurement.
** Potential for flex-rigid circuit design.
** Potential for flex-rigid circuit design.
* Contact '''Nuvia''' to discuss nest stage of scintillator machining:
* Contact '''Nuvia''' to discuss nest stage of scintillator machining:
** Send on PowerPoint slides on scintillator blank requirements from '''Harry Barnett'''.
** Send on PowerPoint slides on scintillator blank requirements from '''Harry Barnett'''.
** Obtain blanks for Datron machining.
** Obtain blanks for Datron machining.
** Discuss potential of new injection moulds as per '''HB's''' requirements.
** Discuss potential of new injection moulds as per '''HB's''' requirements.
* Update Clatterbridge design and arrange experimental run.


=== Finance ===
=== Finance ===

Revision as of 16:05, 11 August 2025

Electronic Log for Simon Jolly

To Do

PBT group eLog pages:

Research

  • QuARC improvements:
    1. Updates to Peli case enclosure from Harry Barnett: see Mech Eng eLog.
    2. Power distribution board, 2.5mm photodiode array readout and 1.5mm photodiode array Clatterbridge module from Pete Hastings (Oxford): see ELogs/Electronics#Oxford.
    3. Optimise speed of web GUI: replace PapaParse with direct XHR?
  • Front-end electronics for QuADProBe SciFi:
    • Confirm
  • Update mechanical design of scintillator stack holder:
    • Move to 4-sided readout.
    • Use BPM-like reconstruction for QuARC position measurement.
    • Potential for flex-rigid circuit design.
  • Contact Nuvia to discuss nest stage of scintillator machining:
    • Send on PowerPoint slides on scintillator blank requirements from Harry Barnett.
    • Obtain blanks for Datron machining.
    • Discuss potential of new injection moulds as per HB's requirements.

Finance

  • Apply for no-cost extension to CLASP grant: 10 months to 31st Jan 2027.
  • Recharge excess costs from 559564 to 567928 and settle up travel.
  • Investigate innovation collaboration with Elekta and CI: follow up with Stewart Boogert.

Grant Opportunities

UCL Physics Intranet Funding Calls

UCL MAPS Faculty Research Funding and Support

UKRI Funding Finder

UCL Internally Managed Calls

Admin

  • Chase up IoP membership.
  • Apply for UCL Leadership Programme
  • Complete appraisal for Joe Bateman.
  • Complete leavers form for Sonia Escribano.

HEP Group

  • Update web pages with information for new users.
  • Add web design and editing pages to HEP group page.

Documents To Review

  • Stanford emails

Teaching