Proton Calorimetry/Experimental Runs/2017: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
(Created page with "The following experimental runs were made in 2017: == 1st-3rd March 2017: MedAustron == * To obtain energy-to-range calibration measurements with a calibration whee...")
 
No edit summary
Line 3: Line 3:
== [[/Mar1-3|1st-3rd March 2017: MedAustron]] ==
== [[/Mar1-3|1st-3rd March 2017: MedAustron]] ==


* To obtain energy-to-range calibration measurements with a calibration wheel used by physicists at Clatterbridge with detector module comprising a 2" PMT and new PS-based scintillator.
* Measurements at MedAustron with longer scintillator and 252MeV beam.
* To obtain data cross-checking measurements taken with the wheel to that taken with PMMA blocks of equivalent thickness at the same location, and further upstream at the modulator box.
* Give longer explanation of the purpose and results.
* To record total dose delivered to the new PS-based scintillator for radiation damage and hardness considerations.
* To record waveform data with new LeCroy HDO6104 oscilloscope.
* To record neutron measurements with the large 8" PMT hexagonal block module.

Revision as of 13:52, 8 March 2017

The following experimental runs were made in 2017:

1st-3rd March 2017: MedAustron

  • Measurements at MedAustron with longer scintillator and 252MeV beam.
  • Give longer explanation of the purpose and results.