Proton Calorimetry/Meetings/2025/01/15: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
== Minutes for UCL Proton Beam Therapy Group Meetings, 8th January ==
== Minutes for UCL Proton Beam Therapy Group Meetings, 15th January ==


=== Present ===
=== Present ===


'''Joe Bateman''', '''Sonia Escribano''', '''Simon Jolly''','''Andreas Korn ''', '''Raffaella Radogna (via teams) ''', '''Harry Barnett ''', '''Matt Warren '''
'''Joe Bateman''', '''Sonia Escribano''', '''Simon Jolly''', '''Andreas Korn ''', '''Raffaella Radogna (via teams)''', '''Harry Barnett''', '''Matt Warren '''
 


=== [[ELogs/RaffaellaRadogna|Raffaella Radogna]] ===  
=== [[ELogs/RaffaellaRadogna|Raffaella Radogna]] ===  
Line 20: Line 19:
** And ensure that raspberry pi in its case with heatsink when attached to lid with shock absorber doesn't collide with scintillator stack when closing lid  
** And ensure that raspberry pi in its case with heatsink when attached to lid with shock absorber doesn't collide with scintillator stack when closing lid  
* Quickest route to get scintillator sheets manufactured in shortest time is via John and Wayne in Wales
* Quickest route to get scintillator sheets manufactured in shortest time is via John and Wayne in Wales
=== [[ELogs/SimonJolly|Simon Jolly]] ===
* Still waiting on harry for updated quarc casing and scintillator sheets machining before
* Harry can send raffy design for updated quart and enclosure to get idea for spacing
** If need can duplicate design with slightly larger case with slightly more longitudinal space
*** i.e. design without breadboard but with two rails
* We have correct read back pattern from Oxford boards - DAQ readout chain is now working and works as designed and signal is much cleaner than before
* Can daisy chain 4 boards together and saw 4 read back patterns
* But 4 small errors on ddc
** Reset signal isn't going through buffer (I.e. takes input through Schmidt triggers)
** Upstream usb connector is 180degrees out
** Potential for ground loops on daisy chaining ddc boards
** Can't currently put photodiodes on board since the boards are missing sockets for them to slot in
* About 4 weeks turn around for Pete to update circuit boards and get them manufactured
=== [[ELogs/SoniaEscribano|Sonia Escribano]] ===
* Create new prod.sh for terminal based daq
* Look at what flags current shell script is pulling it out
* Try and make so that it doesn't require everything in a specific order
* Looking at live calibration data
** 10% difference between live calibration and post-calibration
** Post-calibration reads data twice
* Reverse options no longer working - but only clatterbridge board - but no need to worry about fixing since next clatterbridge module will be half sized ddc board
* Information window on gui being updated
* Higher priority for next quarc only beam test - what do we need that we don't currently have
=== [[ELogs/JoeBateman|Joe Bateman]] ===
* Investigating difference in dose-depth curves between TOPAS and FRED
* Bragg peaks appear to match in plateau but not in Bragg peak and distal fall off (FRED has sharper peak and deposits more dose in Bragg peak)
* Issue seemingly disappears when using mono energetic beam (150 MeV) with no spread - so likely to do with the way the code handles energy straggling
* In discussion with Giorgio and Ilaria from Maestro to discuss issue
* Continue to work on getting QuARC Geant4 simulation up to date and running.
*

Latest revision as of 12:59, 16 January 2025

Minutes for UCL Proton Beam Therapy Group Meetings, 15th January

Present

Joe Bateman, Sonia Escribano, Simon Jolly, Andreas Korn , Raffaella Radogna (via teams), Harry Barnett, Matt Warren

Raffaella Radogna

  • Started filling wiki page for plans for test beam in Trento
  • Received sheets of tuffnel material - whether there will be an updated CAD from harry - on how to proceed on frame for second prototype
  • Will discuss with Bari mech eng to discuss drawings for second prototype designs etc

Harry Barnett

  • Just QuARC enclosure windows left to design
  • Wheels have been added in CAD
  • Everything else pretty much designed - prioritise everything over the wheels
  • Has discussed with Sonia to mount fpga and rasb pi to ceiling - but ideally add a shock absorber for the circuits
    • And ensure that raspberry pi in its case with heatsink when attached to lid with shock absorber doesn't collide with scintillator stack when closing lid
  • Quickest route to get scintillator sheets manufactured in shortest time is via John and Wayne in Wales

Simon Jolly

  • Still waiting on harry for updated quarc casing and scintillator sheets machining before
  • Harry can send raffy design for updated quart and enclosure to get idea for spacing
    • If need can duplicate design with slightly larger case with slightly more longitudinal space
      • i.e. design without breadboard but with two rails
  • We have correct read back pattern from Oxford boards - DAQ readout chain is now working and works as designed and signal is much cleaner than before
  • Can daisy chain 4 boards together and saw 4 read back patterns
  • But 4 small errors on ddc
    • Reset signal isn't going through buffer (I.e. takes input through Schmidt triggers)
    • Upstream usb connector is 180degrees out
    • Potential for ground loops on daisy chaining ddc boards
    • Can't currently put photodiodes on board since the boards are missing sockets for them to slot in
  • About 4 weeks turn around for Pete to update circuit boards and get them manufactured

Sonia Escribano

  • Create new prod.sh for terminal based daq
  • Look at what flags current shell script is pulling it out
  • Try and make so that it doesn't require everything in a specific order
  • Looking at live calibration data
    • 10% difference between live calibration and post-calibration
    • Post-calibration reads data twice
  • Reverse options no longer working - but only clatterbridge board - but no need to worry about fixing since next clatterbridge module will be half sized ddc board
  • Information window on gui being updated
  • Higher priority for next quarc only beam test - what do we need that we don't currently have

Joe Bateman

  • Investigating difference in dose-depth curves between TOPAS and FRED
  • Bragg peaks appear to match in plateau but not in Bragg peak and distal fall off (FRED has sharper peak and deposits more dose in Bragg peak)
  • Issue seemingly disappears when using mono energetic beam (150 MeV) with no spread - so likely to do with the way the code handles energy straggling
  • In discussion with Giorgio and Ilaria from Maestro to discuss issue
  • Continue to work on getting QuARC Geant4 simulation up to date and running.