ELogs/SimonJolly: Difference between revisions
< ELogs
SimonJolly (talk | contribs) No edit summary |
SimonJolly (talk | contribs) No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
=== Research === | === Research === | ||
* '''Recharge | * '''Recharge conference travel expenses.''' | ||
* | * Modify FMC daughterboard design with ZMOD connector — '''Pete Hastings (Oxford)/Andy Rose (Imperial)/Matt Warren'''. | ||
* Organise | * Update DDC board design with improvements from '''Mark Jones (Oxford)''' and '''Duncan Parker (Imperial)'''. Clarify spec with '''Marko Levicnik'''. | ||
* Follow up | * Shrink board to accept 1.5mm sheet spacing for Clatterbridge. | ||
* | * Update mechanical design of scintillator stack holder: | ||
** 3D print prototype using pillar supports. | |||
** Machined version from '''Harry Barnett''' once design fixed. | |||
** Update design with 2 sensors. | |||
* Organise experimental run at UCLH with NPL transmission calorimeter and Birmingham pixel sensor: | |||
** Design holder for NPL using same mounts as scintillator. | |||
** Add holder for absorber plus machined absorber block for QA. | |||
** '''Obtain pixel sensor specs from Tony Price (Birmingham)'''. | |||
* Follow up scintillator machining: | |||
** '''Martin Blackman''' (UCL Mechanical Workshop). | |||
** '''Datron''' (via '''Harry Barnett'''). | |||
** Discuss results with Nuvia. | |||
* Update Clatterbridge design and arrange experimental run. | |||
=== HEP Group === | === HEP Group === | ||
Line 26: | Line 38: | ||
=== Teaching === | === Teaching === | ||
<!-- | |||
== Completed == | == Completed == | ||
Line 31: | Line 44: | ||
=== Teaching === | === Teaching === | ||
--> |
Latest revision as of 11:41, 22 February 2024
Electronic Log for Simon Jolly
To Do
Research
- Recharge conference travel expenses.
- Modify FMC daughterboard design with ZMOD connector — Pete Hastings (Oxford)/Andy Rose (Imperial)/Matt Warren.
- Update DDC board design with improvements from Mark Jones (Oxford) and Duncan Parker (Imperial). Clarify spec with Marko Levicnik.
- Shrink board to accept 1.5mm sheet spacing for Clatterbridge.
- Update mechanical design of scintillator stack holder:
- 3D print prototype using pillar supports.
- Machined version from Harry Barnett once design fixed.
- Update design with 2 sensors.
- Organise experimental run at UCLH with NPL transmission calorimeter and Birmingham pixel sensor:
- Design holder for NPL using same mounts as scintillator.
- Add holder for absorber plus machined absorber block for QA.
- Obtain pixel sensor specs from Tony Price (Birmingham).
- Follow up scintillator machining:
- Martin Blackman (UCL Mechanical Workshop).
- Datron (via Harry Barnett).
- Discuss results with Nuvia.
- Update Clatterbridge design and arrange experimental run.
HEP Group
- Update web pages with information for new users.
- Add web design and editing pages to HEP group page.
- Organise lab tools with Harry and Connor.
- Obtain quote and write justification for Datron CNC.
- Obtain quote and write justification for MarkForged 3D printer.
- Set up group MacBook with JAMF again.
Documents To Review
- FLASH paper