ELogs/SimonJolly: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(28 intermediate revisions by the same user not shown)
Line 3: Line 3:
== To Do ==
== To Do ==


=== Documents To Review ===
=== Research ===
 
* '''Recharge conference travel expenses.'''
* Modify FMC daughterboard design with ZMOD connector — '''Pete Hastings (Oxford)/Andy Rose (Imperial)/Matt Warren'''.
* Update DDC board design with improvements from '''Mark Jones (Oxford)''' and '''Duncan Parker (Imperial)'''. Clarify spec with '''Marko Levicnik'''.
* Shrink board to accept 1.5mm sheet spacing for Clatterbridge.
* Update mechanical design of scintillator stack holder:
** 3D print prototype using pillar supports.
** Machined version from '''Harry Barnett''' once design fixed.
** Update design with 2 sensors.
* Organise experimental run at UCLH with NPL transmission calorimeter and Birmingham pixel sensor:
** Design holder for NPL using same mounts as scintillator.
** Add holder for absorber plus machined absorber block for QA.
** '''Obtain pixel sensor specs from Tony Price (Birmingham)'''.
* Follow up scintillator machining:
** '''Martin Blackman''' (UCL Mechanical Workshop).
** '''Datron''' (via '''Harry Barnett''').
** Discuss results with Nuvia.
* Update Clatterbridge design and arrange experimental run.
 
=== HEP Group ===


* AWAKE spectrometer paper
* Update web pages with information for new users.
* Quenched Bragg curve paper
* Add web design and editing pages to HEP group page.
* Patent application
* Organise lab tools with Harry and Connor.
* MSci literature reports
* Obtain quote and write justification for Datron CNC.
* MSc progress reports
* Obtain quote and write justification for MarkForged 3D printer.
* Set up group MacBook with JAMF again.


=== Research ===
=== Documents To Review ===


* Contact Cosylab about funding options.
* FLASH paper
* Check with Institute of Making about cutting scintillator blocks; maybe order skip-tooth 3TPI bandsaw blade.
* Arrange travel for OMA school at Medustron.
* Arrange trip to Australia.
* Organise next Heidelberg visit
* Update UCL IRIS profile


=== Teaching ===
=== Teaching ===


* Arrange visit to Clatterbridge for Ohie to check dimensions.
<!--
* Mark MSci Literature Reviews
* Mark MSci Progress Reports
 
== Completed ==
== Completed ==


=== Research ===
=== Research ===
==== January 2019 ====
* Contacted TI, signed NDA, obtained all documentation for DDC1128 and EVM.
* Delivered scintillator blocks to Birmingham University for Radiotherapy dosimetry: '''Ross Longmore''' will visit UCL to try some experimental cutting of scintillator blocks with '''Derek Attree'''.
* Design new multi-use patch panel for enclosures.
* Send CAD model of analogue patch panel for machining.
* Register for [https://ptcog58.org PTCOG 58 in Manchester]:
** Arrange accommodation for group.
* Submit expense claims.


=== Teaching ===
=== Teaching ===
 
-->
==== January 2019 ====
 
* Gave talk at UCLH on accelerators for proton therapy.  All resources available in this directory: [http://www.hep.ucl.ac.uk/pbt/wikiData/presentations/2018/SJ_UCLH_PBTAccelIntro_09-08-18/ http://www.hep.ucl.ac.uk/pbt/wikiData/presentations/2018/SJ_UCLH_PBTAccelIntro_09-08-18/].
* Marked Saad's Literature Review and sent back comments; mark sheet still outstanding.

Latest revision as of 11:41, 22 February 2024

Electronic Log for Simon Jolly

To Do

Research

  • Recharge conference travel expenses.
  • Modify FMC daughterboard design with ZMOD connector — Pete Hastings (Oxford)/Andy Rose (Imperial)/Matt Warren.
  • Update DDC board design with improvements from Mark Jones (Oxford) and Duncan Parker (Imperial). Clarify spec with Marko Levicnik.
  • Shrink board to accept 1.5mm sheet spacing for Clatterbridge.
  • Update mechanical design of scintillator stack holder:
    • 3D print prototype using pillar supports.
    • Machined version from Harry Barnett once design fixed.
    • Update design with 2 sensors.
  • Organise experimental run at UCLH with NPL transmission calorimeter and Birmingham pixel sensor:
    • Design holder for NPL using same mounts as scintillator.
    • Add holder for absorber plus machined absorber block for QA.
    • Obtain pixel sensor specs from Tony Price (Birmingham).
  • Follow up scintillator machining:
    • Martin Blackman (UCL Mechanical Workshop).
    • Datron (via Harry Barnett).
    • Discuss results with Nuvia.
  • Update Clatterbridge design and arrange experimental run.

HEP Group

  • Update web pages with information for new users.
  • Add web design and editing pages to HEP group page.
  • Organise lab tools with Harry and Connor.
  • Obtain quote and write justification for Datron CNC.
  • Obtain quote and write justification for MarkForged 3D printer.
  • Set up group MacBook with JAMF again.

Documents To Review

  • FLASH paper

Teaching