Proton Calorimetry/Meetings/2018/01/24: Difference between revisions
SimonJolly (talk | contribs) (Created page with "== Minutes for UCL Proton Calorimetry Meeting, 24th January 2018 (D17, Physics & Astronomy, UCL) == === Present === '''Simon Jolly''', '''Laurent Kelleter''', '''Matthieu Hentz...") |
SimonJolly (talk | contribs) No edit summary |
||
Line 5: | Line 5: | ||
'''Simon Jolly''', '''Laurent Kelleter''', '''Matthieu Hentz''', '''Anastasia Basharina-Freshville''', '''Jordan Silverman''', '''Dan Walker''' | '''Simon Jolly''', '''Laurent Kelleter''', '''Matthieu Hentz''', '''Anastasia Basharina-Freshville''', '''Jordan Silverman''', '''Dan Walker''' | ||
''' | '''LK''': | ||
* | * Investigating [http://www.hep.ucl.ac.uk/pbt/wikiData/presentations/2018/LK20180124_AnalyseImageData.pdf image acquisition for Nikon camera]: | ||
** Using '''SJ''' liquid scintillator image to test reconstruction. | |||
** Integrating single column of pixels to get 1D curve. | |||
** '''SJ''' | ** Gets an approximate Bragg curve from integrated signal but reflections in image make curve poor. | ||
** | |||
* ''To Do'': | * ''To Do'': | ||
** | ** Computer upgraded to Centos7: fit doesn't work any more (ROOT integrator fails). | ||
** | ** Find a way to deal with very different scintillator slice thicknesses | ||
** | ** Data format of ISDI sensor? | ||
** Make everything more smooth and ready-to-use for users | |||
** Make sure camera hardware is set up ready for DAQ. | |||
'''JS''': | '''JS''': | ||
* | * Making measurements of [http://www.hep.ucl.ac.uk/pbt/wikiData/presentations/2018/JS_23_01_2018.pdf scintillator sheet thickness]: | ||
** 3 mm sheets are closer to 2.75 mm but variation is mostly below 100 microns. | |||
** 2 mm sheets have 2 groupings: | |||
** 2.0 mm group has better flatness than 2.6 mm group. | |||
* Also been playing around with Clatterbridge simulations: | |||
** Tried running on Centos7. | |||
** Will go back to SL6 as it actually works properly... | |||
* ''To Do'': | |||
** Split up 2 mm sheet results into the 2 groups. | |||
** Meeting with Matthieu on Clatterbridge simulations. | |||
** Get them running on SL6. | |||
'''DW''': | |||
* Investigating negative integrated waveforms form LeCroy binary files: | |||
** One bad pulse comes from small tail in leading pulse region. | |||
** Reducing standard deviation for this region cuts out bad pulse. | |||
* Put up instructions on LeCroy binary file conversion for '''Tony Price''' on PBTWiki. | |||
* ''To Do'': | * ''To Do'': | ||
** | ** Adding integration window to get spectrum to match Caen ADC data. | ||
** Badger '''Tony Price''' for tracker files. | |||
'''ABF''': | '''ABF''': | ||
* Will | * Writing paper: finish off plots and majority of writing. | ||
* Painting scintillator sheets: | |||
** Both paints look good so far. | |||
** | ** Will check on Monday for painting all sheets. | ||
** | * Final version of 3 month plan requested by '''SJ''': | ||
** Will include notes from previous meetings and circulate. | |||
** Will '''not''' include any details of final plans for beam tests: waiting for discussion with '''Ruben Saakyan'''. | |||
** '''SJ''' strongly objected to choice not to decide on complete schedule in advance, but left choice to '''ABF'''. | |||
** '''SJ''' requested to be involved in meeting with '''RS''' regarding final beam schedule. | |||
* ''To Do'': | * ''To Do'': | ||
** | ** Complete main draft of schedule (but NOT including requirements for beam tests). | ||
** | ** Painting scintillator. | ||
** | ** First draft by next week. | ||
'''MH''': | '''MH''': | ||
* | * Finished all first term exams and coursework. | ||
* | * Second term courses starting to bear fruit! But needs to learn background mathematics... | ||
* Will attend proton imaging workshop in Lyon, 14–15 June. | |||
* | * Currently compiling Geant4 on Virtual Machine on '''new''' MacBook. | ||
* | |||
* ''To Do'': | * ''To Do'': | ||
** Meeting with Jordan on Wednesday. | ** Meeting with Jordan on Wednesday. | ||
** Buffering of readout in Geant4. | ** Buffering of readout in Geant4. |
Latest revision as of 15:11, 24 January 2018
Minutes for UCL Proton Calorimetry Meeting, 24th January 2018 (D17, Physics & Astronomy, UCL)
Present
Simon Jolly, Laurent Kelleter, Matthieu Hentz, Anastasia Basharina-Freshville, Jordan Silverman, Dan Walker
LK:
- Investigating image acquisition for Nikon camera:
- Using SJ liquid scintillator image to test reconstruction.
- Integrating single column of pixels to get 1D curve.
- Gets an approximate Bragg curve from integrated signal but reflections in image make curve poor.
- To Do:
- Computer upgraded to Centos7: fit doesn't work any more (ROOT integrator fails).
- Find a way to deal with very different scintillator slice thicknesses
- Data format of ISDI sensor?
- Make everything more smooth and ready-to-use for users
- Make sure camera hardware is set up ready for DAQ.
JS:
- Making measurements of scintillator sheet thickness:
- 3 mm sheets are closer to 2.75 mm but variation is mostly below 100 microns.
- 2 mm sheets have 2 groupings:
- 2.0 mm group has better flatness than 2.6 mm group.
- Also been playing around with Clatterbridge simulations:
- Tried running on Centos7.
- Will go back to SL6 as it actually works properly...
- To Do:
- Split up 2 mm sheet results into the 2 groups.
- Meeting with Matthieu on Clatterbridge simulations.
- Get them running on SL6.
DW:
- Investigating negative integrated waveforms form LeCroy binary files:
- One bad pulse comes from small tail in leading pulse region.
- Reducing standard deviation for this region cuts out bad pulse.
- Put up instructions on LeCroy binary file conversion for Tony Price on PBTWiki.
- To Do:
- Adding integration window to get spectrum to match Caen ADC data.
- Badger Tony Price for tracker files.
ABF:
- Writing paper: finish off plots and majority of writing.
- Painting scintillator sheets:
- Both paints look good so far.
- Will check on Monday for painting all sheets.
- Final version of 3 month plan requested by SJ:
- Will include notes from previous meetings and circulate.
- Will not include any details of final plans for beam tests: waiting for discussion with Ruben Saakyan.
- SJ strongly objected to choice not to decide on complete schedule in advance, but left choice to ABF.
- SJ requested to be involved in meeting with RS regarding final beam schedule.
- To Do:
- Complete main draft of schedule (but NOT including requirements for beam tests).
- Painting scintillator.
- First draft by next week.
MH:
- Finished all first term exams and coursework.
- Second term courses starting to bear fruit! But needs to learn background mathematics...
- Will attend proton imaging workshop in Lyon, 14–15 June.
- Currently compiling Geant4 on Virtual Machine on new MacBook.
- To Do:
- Meeting with Jordan on Wednesday.
- Buffering of readout in Geant4.