From mp@hep.ucl.ac.uk Wed Jan 28 12:09:54 1998 Date: Wed, 28 Jan 1998 11:02:48 GMT From: "MARTIN POSTRANECKY,UCL-PHYSICS DEP,HEPP GROUP,GOWER ST,LONDON WC1E 6BT,TEL:(00-44)-[0]171-419 3453,FAX:[0]171-380 7145" To: meh@ax8.hep.ucl.ac.uk, mp@ax8.hep.ucl.ac.uk Subject: MTC_2_SETUP file Z-MTC-2 SETTING - UP LIST =========================== MP - UCL, 17 March 1996 NOTE : All diagram numbers refer to the latest -A- version of CAD FILE TITLE PC3027M Issue A ( Z MASTER TIMING CONTROLLER ) dated 24.1.95 Diag.No: Set: ======== ==== 1) 12 Wire-wrap CLOCK TIMING LINKs as follows : ----------------------------------------- CLK11: P56 ( DL3/12 ) to P46 ( U68/3 ) CLK13: P77 ( DL7/3 ) P51 ( U68/8 ) CLK14: P58 ( DL3/11 ) P47 ( DL6/2 ) P99 ( DL6/2 ) P87 ( U68/4 ) ( = DL6 by-passed ) CLK21: P69 ( DL5/11 ) P48 ( U68/6 ) CLK23: P75 ( DL7/1 ) P50 ( U68/9 ) CLK24: P78 ( DL7/12 ) P52 ( U68/7 ) NCLK2: P71 ( DL5/10 ) P49 ( U67/3 ) MTCSTR.:P56 ( DL3/12 ) P45 ( DL4/2 ) P88 ( DL4/2 ) P86 ( U68/2 ) ( = DL4 by-passed ) 2) 20 Wire-wrap CLOCK TIMING LINKs as follows : ----------------------------------------- INCLK: P31 ( DL2/12 ) to P26 ( U44/4 ) INCLK2: P30 ( DL2/3 ) P25 ( U44/3 ) CLKIN: P1 ( U56/9 ) P4 ( U15/28) P27 ( DL1/2 ) P32 ( DL2/4 ) P48NS: P14 ( DL1/5 ) P10 ( U30/2 ) N48NS: P13 ( DL1/4 ) P9 ( U43/1 ) /cont. - 2 - 3) 14 Connect MTCBUSY ENABLE LINK : ----------------------------- P40 to P41 4) 18 Connect ROCPIPEFR ENABLE LINK : ------------------------------- P43 to P44 5) 20 Connect 2ERRORON ENABLE LINK : ------------------------------ P7 to P8 6) Set DIL SWITCH SW.11 as follows : --------------------------------- 16 SW.11A P/L CYCLE - OFF - ( Continuous ) 10 SW.11B XTAL CLK - ON - ( Continuous ) 12 SW.11C CLK SPEED - ON - ( 48 nsec ) 10 SW.11D SELECT CLK - ON - ( ROC selects ) This version: MP-UCL, 17 Mar. 1996 Previous versions : 2 June 1995 3 May 1995 2 May 1995 7 Nov. 1994