ELogs/MechanicalEngineering
Electronic Log for Mechanical Engineering
To Do
Modifications to Peli 1510 case after Prague/UCLH
- Wheels & Mobility (Zarges)
- Redesign wheel fitting mechanism:
- Current bolt/axle slot is poorly suited for removal (too big/shallow).
- Explore a better method to install/remove and secure the wheels.
Wheel holders: Wheel holders from Zarges case are now on my desk Redesign and reprint parts to fit under the Peli case and hold the zargis mechanism Peli Case Modifications Alignment plates: (I might need photos to help me understand) Plates sit at different heights, possibly due to misaligned bolt holes. This could have been caused by the new wheel holder prints making one side sit higher. Investigate redrilling or creating wider plates to align with the Peli case lip or just make better plates. Box markings: Add markings on the case to correlate with cover plate positions for easier alignment during module removal/reinstallation. (this is difficult with the Peli case) Thermal & Mechanical Concerns Raspberry Pi heat: Case has poor airflow; consider ventilation that maintains light-tightness and structural integrity (light tight and ventilation are not word that go well together) Module height and Pi proximity: Module 4 too close to Pi; was warm post-beam test. Redesign crossbars to lower stack height and improve thermal spacing.
- New scintillator stack holders:
- Stack holders 3D printed: remake by hand if time allows.
- Mounting plate to screw to Thorlabs optical breadboards in Peli cases:
- Rough version already 3D printed.
- Needs modifying to fix stack holder in place with M14(?) nuts.
- Must be able to mount upside down.
- New frame needed for patch panel with 50mm stand off to allow deeper connectors not to interfere with scintillator stacks.
- Holder for NPL Transmission Calorimeter:
- TC needs to mount into Peli Case in front of stack holders.
- CAD STEP-files already received from Sam Flynn (NPL) for existing holder.
- If making new holder, exit pipe for electronics cabling needs to be shortened to fit in small Peli case.
- If making holder for holder, must mount to Thorlabs optical breadboard (M6 holes on 25mm pitch?).
- Centre of holder must be 71 mm from baseplate (scintillator stacks are 50mm radius, plus 21mm offset from base).
- Holder for Birmingham Pixel Sensor:
- Tony Price (Birmingham) has provided dimensions to HB.
- Holder needed to support pixel sensor between TC and scintillators.
- Peli case needs 100x10mm slot cut to left of side handle to allow sensor ribbon cable to pass through.
- Nozzle mount for detector enclosure:
- Small Peli case needs to be nozzle-mounted for beam tests.
- Dimensions already obtained from UCLH measurements:
- SJ has contacted UCLH to check whether we can bypass light curtain.
- Assume we can't and design to bypass mechanically...
- 3 parts needed:
- Nozzle mounting plate that sits inside nozzle using range modulator plate mounting slots.
- U-bracket that slots in to this mounting plate — bypassing the light curtain — with a 40 x 30 cm hole for the beam to pass through.
- Peli Case support that fixes to the U-bracket and holds the Peli Case whilst gantry is rotating.
Scintillator Machining
- Bari scintillating fibre holder:
- Bari are designing the scintillating fibre assembly for the QuADProBe.
- Prototype fibre array holder machined from aluminium.
- Clinical prototype ideally needs a version in plastic.
- Review Bari CAD drawings and recommend suitable materials.
- Scintillator machining:
- Promising results from Datron: chase up potential workshops who could machine scintillator for us.
- Liaise with Martin Blackman in main workshop to assess quality of his scintillator machining.
- Write case and obtain quote for us to purchase Datron Neo.
Long Term
Completed
2025
2024
2023
- January-May
- Enclosure design for small-scale Clatterbridge detector prototype (with Simon).
- Includes feedthroughs, mounts for NUC PC, Raspberry Pi and USB104 FPGA.
- Nozzle mounted
2022
- November-December
- Design and 3D print external frame with alignment marks and alignment plates for small Peli case.
- Duplicate alignment bar from Zarges case with circular studs to allow alignment with treatment couch.
- October
- Modified medium-sized Peli case ready for beam tests:
- Install Thorlabs optical breadboard in base of case.
- Cut out window at each end of case for mylar window installation.
- Cut out 2 windows for 2-gang patch panels, 1 per side.
- Cut out 2 windows for 1-gang patch panels, 1 per end.
- 3D print internal frames for mylar windows with bolt holes in each corner. Drill bolt holes in Peli case.
- 3D print external frame with alignment marks matching centre line of optical breadboard (vertical) and 71mm above optical breadboard (horizontal). Match bolt holes to mylar window frames.
- 3D print alignment plates that are strong enough to double as external cover plates when shipping enclosure.
- September
- Machine a patch panel complete with 10 smaller panels that can be swapped between on the main patch panel to allow for various electrical feedthroughs
- August
- Created CAD cross hair for Peli Case to be printed. Also created small printed windows to clamp Mylar smooth over the beam entry point.
- July
- Created CAD models for internal components including:
- Scintillator holder.
- 2x Side Vice faces.
- 1x Front Vice face.
- Cover for beam entry point.
- These were printed soon after.
- Beam entry point was cut out of the case, piece was sent for testing with Adam Gibson.
- Machined two special 1/4-20 UNC screws for camera mount.
- Tapped all holes on Scintillator holder to take m5 nylon screws to allow vice faces to travel.
- June
- Initiated design of large Peli Case. Received Lab scissor jack used to mount camera.
- May
- CAD Prototype a sliding system to mount multiple scintillator holders into a case
- February
- Create CAD model for small Peli Case so ideas on how to install the holder into the case can be prototyped
2021
- November
- Design initial prototype of a new holder that will clamp scintillator sheets together. Will supersede previous adhesive idea
- June
- Prepare scintillator sheets to be adhered together using standard primer