ELogs/JamesGolbourn
< ELogs
Electronic Log for James Golbourn
To Do:
- Email Alison for details of Hakan Nystrom.
- Get in contact with Laurent contact at Med Austrom about QA procedures.
- Prepare practice presentation for project (8/2/19)
- Write up report on meeting with UCLH.
- Look at what functioning centres are using as QA.
- Look at advantages and disadvantages of QA systems.
- Write research essay.
- Update presentation with corrections made.
Tasks Completed:
- Presentation to PBT group.
- Project progress report.
- Project outline.
Key Dates:
- Project Outline - 03/12/2018
- Project Progress Report - 31/01/2019
- Short Presentation - 08/02/2019 (9.00 am)
- Research Essay - 31/03/2019
- Thesis Deadline - 22/08/2019
- Final Presentation - 02/09/2019
Progress Report Outline:
- Introduction to Proton beam therapy.
- What is Quality Assurance?
- Important beam characteristics.
- Commercially available devices such as the Matrixx, Lynx and Sun Nuclear QA3.
- Other methods for measuring beam properties.
Comments made about presentation:
- Understand what range modulators do.
- Look into whether Zebra was initially designed for X-Rays.
- Zebra not often used for daily QA due to the very long initial set up time.
- Investigate film dosimetry e.g Gafchromic film.
- Research Lynx scintillator.
- Range calorimeter - need a moving absorber, e.g water tank, to measure energy and range.
- Know difference between scintillator screens and fibres - fibres use fibre optics and are not used due to needing something to read output from each fibre which is expensive.
- UCLH will have 4 treatment rooms.
- Put slide number on presentation.
- Expand on each daily QA:
- Table of devices
- Tolerances
- How long it takes
- Collect standards and tolerances on energy, spot size and output.