ELogs/UnikLimbu
< ELogs
Electronic Log for Unik Limbu
To Do
Add list of to-do list items
- Implementing two text-entry boxes for the minimum (0mm) and maximum range which updates automatically when the number of photodiodes is entered
- The x-axis must show millimetres, not photodiode numbers because the important quantity is the Water Equivalent Thickness that the protons have penetrated
- Getting rid of the buttons that reload the plot and instead implement four check boxes on the plot
- Raw photodiode values
- Error bars
- Quenched Bragg curve
- Bortfeld curve
- Convert the Start and Stop buttons into a single button that changes role depending on whether the display is running or stopped
- If it's stopped: it should say "Run" and start the display running
- If it's running: it should say "Stop" and should stop or pause the display
Completed
- Understood and made use of Papa Parse to load the data
- Keep all the code in the same repository
- Learnt and understood about Version Control System (VCS) by watching videos and reading documentation on Git
- Tested using Git with VS Code and GitHub
- Use git commits to each stage of development of the code
- Clone the repository into the web directory so that all the code is the same
- Computing the photodiode intensity bar chart using the Papa Parse
- Adding axes to the photodiode intensity bar chart
- Getting rid of the photodiode number buttons and implement a text-entry box for the number of photodiodes instead
August-September Schedule
- Have to leave my current flat by the 31st of August (I will probably leave around the 28th)
- In2research poster deadline on the 31st August
- Graduation ceremony on the 1st September
- Final date of the project is 2nd September