Proton Calorimetry/Experimental Runs/2024/UCLHQuADProBe 2024-04: Difference between revisions
Line 51: | Line 51: | ||
[http://www.hep.ucl.ac.uk/pbt/wikiData/images/UCLH_Nov2021/UCL_Setup.png http://www.hep.ucl.ac.uk/pbt/wikiData/images/UCLH_Jun2022/UCL_Setup.png] | [http://www.hep.ucl.ac.uk/pbt/wikiData/images/UCLH_Nov2021/UCL_Setup.png http://www.hep.ucl.ac.uk/pbt/wikiData/images/UCLH_Jun2022/UCL_Setup.png] | ||
</div> | </div> | ||
== Experiment Plan == | == Experiment Plan == |
Revision as of 12:58, 26 April 2024
Experiment Equipment
Item | Notes |
---|---|
Portable Enclosure | Modified Small Peli Case Wheeled. Features mount for scintillator stacks, front and back openings for beam, patch panel with ports. Mylar windows with 3D printed alignment plates: approximately light-tight. |
Rev. D Scintillator stack 1 | 32 X x 105 mm, Y x 105 mm and Z x (approx) 3 mm sheets. Original injection moulded batch with polished edges and sanded faces. Containing sheets (ascending photodiode order, board upside down): 137, 138, 139, 140, 141, 142, 143, 144, 145, 146, 147, 148, 149, 150, 151, 152, 153, 154, 155, 156, 157, 158, 159, 160, 161, 162, 163, 164, 165, 166, 167, 168. Full stack thickness measurements (in mm): 95.75, 96.02, 96.09 = 95.95 |
Rev. D Scintillator stack 2 | 32 X x 105 mm, Y x 105 mm and Z x (approx) 3 mm sheets. Machined block with polished edges and sanded faces. Containing sheets (ascending photodiode order, board upside down): 289, 268, 291, 277, 300, 264, 282, 276, 271, 285, 262, 280, 295, 281, 297, 290, 270, 284, 294, 299, 269, 302, 301, 296, 287, 263, 288, 293, 285, 265, 275, 292. Full stack thickness measurements (in mm): 96.89, 96.85, 96.70 = 96.81 |
Rev. D Texas Instruments DDC232 custom circuit board (x2) | Housing 32x Hamamatsu S12915-16R photodiodes, coupled directly to scintillator sheets. Aligned by eye to scintillator sheets. |
Nexys Video FPGA development board. | For interfacing between DDC232 and pi. |
Raspberry pi5 | Control data acquisition + visualise GUI. |
Power Strip: | To connect FPGA and daughter board. |
DAQ laptop x1 | Back up option for data acquisition. |
Control Laptop x2 | 1 for remote control, 1 for notes/web GUI. |
D-LINK Network Hub | Set in experimental room to connect pi5, DAQ laptop + NPL devices |
GL-Inet Router | Set in control room to take output from experimental room ethernet connection. Control laptops connected via ethernet or 5GHz WiFi. |
Ethernet Cable x 4 | To connect pi5 and DAQ laptop to network in the experimental room, hub to wall and in control room router to wall, and router to laptop. |
Spare Cables: | Usb-C |
Gloves | For handling scintillator |
Schematic
Experiment Plan
...
Experiment Notes
Stack A + NUC PC.
Beam current **
Run number | Beam Energy (MeV) | Dose Rate (MU/min) | Estimated Range in Eye (mm) | Spot size (mm, FWHM) | DDC232 FSR (pC) | DDC232 Integration Time (us) | Measurements | Comments | Photodiode QB Fit | Replay Fit |
---|---|---|---|---|---|---|---|---|---|---|
0 | Background | - | - | - | - | - | 170 (constant) | - | ||
1 | - | - | - | - | - | - | - | - |