Proton Calorimetry/Experimental Runs/2022/Sep1: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 8: Line 8:


== Experiment Plan ==
== Experiment Plan ==
Estimated first beam: 16.00.
# Set up mains cabling and networking in treatment and control rooms.
#
*WET measurement of stack of clear sheets with mylar foil.
*WET measurement of stack of clear sheets with mylar foil.
*Addition of stack of white painted sheets for WET measurement of both stacks.
*Addition of stack of white painted sheets for WET measurement of both stacks.

Revision as of 18:55, 31 August 2022

Detector Equipment

  • C-section stack holder containing 25 clear scintillator sheets around 2.86 mm thick with 24 sheets of mylar foil. Add 25th sheet of Mylar?
  • C-section stack holder containing 23 white painted scintillator sheets around 2.86 mm thick.
  • Zarges case.
  • Clatterbridge stack A and B (to be assembled during beam test)
  • DDC232 rev. B x2 & Nexys Video.
  • Single Scintillator Block & camera.

Experiment Plan

Estimated first beam: 16.00.

  1. Set up mains cabling and networking in treatment and control rooms.
  • WET measurement of stack of clear sheets with mylar foil.
  • Addition of stack of white painted sheets for WET measurement of both stacks.
  • Removal of stack of clear sheets for WET measurement of stack of white painted sheets.
  • WET measurement of Zarges case with mylar windows without any stacks of scintillator.
  • Quenching measurements?
    • Assemble Clatterbridge stacks during these measurements
  • Calibration shoot-through measurements for Clatterbridge stacks.
    • Possible WET measurement of Clatterbridge A stack?