Proton Calorimetry/Meetings/2022/08/10: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
(Created page with "== Minutes for UCL Proton Calorimetry Meetings, 10th August == === Present === '''Saad Shaikh''', '''Simon Jolly''', '''Unik Limbu''' === Saad Shaikh === *")
 
No edit summary
 
Line 6: Line 6:


=== [[ELogs/SaadShaikh|Saad Shaikh]] ===
=== [[ELogs/SaadShaikh|Saad Shaikh]] ===
*
*Tested Rev. D boards – molex connection works well with 4 boards daisy-chain, however severe problems with USB-C connection.
**Marko will set up and test on his side, but will try and debug some signals with scope.
*Created experiment pages for UCLH Giraffe measurements, 1st September UCLH beam test, Clatterbridge beam test and Manchester beam test.
*Met with Sam Manger to discuss Manchester beam test: provisional dates set for 25th/26th October.
*Provided Simon with thicknesses of clear stack and white painted stack for Giraffe measurements.
*Provided Simon with preliminary configurations for Clatterbridge stacks.
*Found guide on [https://digilent.com/reference/learn/programmable-logic/tutorials/nexys-video-programming-guide/start#creating_program_file Quad-SPI programming with Nexys Video].
*Wrote first draft of [http://www.hep.ucl.ac.uk/pbt/wikiData/presentations/2022/SS220808_QuARC.pptx presentation on QuARC history].

Latest revision as of 14:34, 10 August 2022

Minutes for UCL Proton Calorimetry Meetings, 10th August

Present

Saad Shaikh, Simon Jolly, Unik Limbu

Saad Shaikh

  • Tested Rev. D boards – molex connection works well with 4 boards daisy-chain, however severe problems with USB-C connection.
    • Marko will set up and test on his side, but will try and debug some signals with scope.
  • Created experiment pages for UCLH Giraffe measurements, 1st September UCLH beam test, Clatterbridge beam test and Manchester beam test.
  • Met with Sam Manger to discuss Manchester beam test: provisional dates set for 25th/26th October.
  • Provided Simon with thicknesses of clear stack and white painted stack for Giraffe measurements.
  • Provided Simon with preliminary configurations for Clatterbridge stacks.
  • Found guide on Quad-SPI programming with Nexys Video.
  • Wrote first draft of presentation on QuARC history.