Proton Calorimetry/Meetings/2022/04/27: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
(Created page with "== Minutes for UCL Proton Calorimetry Meetings, 27th April == === Present === '''Saad Shaikh''', '''Simon Jolly''', '''Raffaella Radogna''' === [[ELogs/SaadShaikh|Saad Shaik...")
 
No edit summary
 
Line 9: Line 9:
**3 sheets slightly too large for holder, will need sanding.
**3 sheets slightly too large for holder, will need sanding.
**Will optimise stack with 48 sheets (25 clear, 23 white) and find required depth for stack holder.
**Will optimise stack with 48 sheets (25 clear, 23 white) and find required depth for stack holder.
**
*Cut 5 10cmx10cm Mylar foil sheets for lab LED tests. Will begin tests from tomorrow.
*Cut 5 10cmx10cm Mylar foil sheets for lab LED tests. Will begin tests from tomorrow.
*Implemented high-resolution PDD and PDL curves in simulation
*Implemented high-resolution PDD and PDL curves in simulation
**Observe stepping in dose-depth profile correlating with sheet widths. Limiting max step size may fix this.
**Observe stepping in dose-depth profile correlating with sheet widths. Limiting max step size may fix this.
**Observe diverging light output at sheet boundaries. Will need to track photons to investigate.
**Observe diverging light output at sheet boundaries. Will need to track photons to investigate.
*Matt Warren  
*Matt Warren is up for redesigning daughter board from FMC to Zmod. Will ask Marko to provide editable schematics.
**Will also ask Matt about removing resistors from Rev. B boards to fix daisy-chain.
*Simon has spoken to Andy Poynter about beam tests: possibility to do 2 beam tests before end of September.
*Simon has spoken to Andy Poynter about beam tests: possibility to do 2 beam tests before end of September.

Latest revision as of 15:35, 27 April 2022

Minutes for UCL Proton Calorimetry Meetings, 27th April

Present

Saad Shaikh, Simon Jolly, Raffaella Radogna

Saad Shaikh

  • 25 new 2.86mm sheets labelled and measured.
    • 3 sheets slightly too large for holder, will need sanding.
    • Will optimise stack with 48 sheets (25 clear, 23 white) and find required depth for stack holder.
  • Cut 5 10cmx10cm Mylar foil sheets for lab LED tests. Will begin tests from tomorrow.
  • Implemented high-resolution PDD and PDL curves in simulation
    • Observe stepping in dose-depth profile correlating with sheet widths. Limiting max step size may fix this.
    • Observe diverging light output at sheet boundaries. Will need to track photons to investigate.
  • Matt Warren is up for redesigning daughter board from FMC to Zmod. Will ask Marko to provide editable schematics.
    • Will also ask Matt about removing resistors from Rev. B boards to fix daisy-chain.
  • Simon has spoken to Andy Poynter about beam tests: possibility to do 2 beam tests before end of September.