Proton Calorimetry/Meetings/2021/09/29: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
No edit summary
Line 22: Line 22:
*Beam test at Clatterbridge likely to not happen until new year.
*Beam test at Clatterbridge likely to not happen until new year.
*Fern has provided headless Pi, will take home to test.
*Fern has provided headless Pi, will take home to test.
**Need to set-up static IP address in order to use WiFi.
**Probably easiest to SSH from Mac when using it, requires static IP address.
**Probably easiest to SSH from Mac when using it.
*Looking into multi-threading for live fitting.
*Looking into multi-threading for live fitting.
*Brief investigation into executing bash commands from webpage, [https://stackoverflow.com/questions/6235785/run-a-shell-script-with-an-html-button this forum post] may be useful.
*Brief investigation into executing bash commands from webpage, [https://stackoverflow.com/questions/6235785/run-a-shell-script-with-an-html-button this forum post] may be useful.

Revision as of 13:48, 30 September 2021

Minutes for UCL Proton Calorimetry Meetings, 15th September

Present

Simon Jolly, Saad Shaikh, Jeremy Ocampo

Saad Shaikh

  • Met with Raffy to discuss poster for IEEE NSS MIC
    • Raffy to draft landscape version of poster and slides for video presentation.
    • Will meet again to discuss recording of video.
  • Raffy mentioned that we have a UV LED already, will look for it.
    • Will take care not to dismantle detector after next UCLH beam in order to take calibration measurements with UV LED.
  • Simon has heard back from Andy: UCLH beam test possible within next 1-2 months. Exact date TBC. Measurements to be made:
    • Background & calibration
    • Pencil beams, 70-110 MeV, 3 currents (high, low, very low)
    • ±5mm in x-y plane for given z
    • Range steps, no x-y scanning (demo live fit)
      • Will investigate behaviour of live fit when detector is seeing darkness. May require some gating feature.
    • Box field treatment plan
    • Steer beam towards photodiodes(?)
  • Will test experimental setup next week. CMOS sensor to not be used.
  • Beam test at Clatterbridge likely to not happen until new year.
  • Fern has provided headless Pi, will take home to test.
    • Probably easiest to SSH from Mac when using it, requires static IP address.
  • Looking into multi-threading for live fitting.
  • Brief investigation into executing bash commands from webpage, this forum post may be useful.
  • Discussed first version of Connor's stack design:
    • Main issue is providing enough support for sheets of different sizes.
    • Current method would require entire detector recalibration if a module is removed.
    • Is there a way of securing 32 sheets in a gapless holder?
    • Will reconvene with Connor to discuss feedback.
  • Will meet with Marko and Clive tomorrow to discuss Rev C design.