Proton Calorimetry/Experimental Runs/2016/Aug2-3: Difference between revisions
HiuFungWong (talk | contribs) |
HiuFungWong (talk | contribs) |
||
Line 104: | Line 104: | ||
| -900 || ST || || || 0 || N/A || waveforms || 31 <br>(~1.2 GB)|| | | -900 || ST || || || 0 || N/A || waveforms || 31 <br>(~1.2 GB)|| | ||
|- | |- | ||
| -900 || ST || | | -900 || ST || Rate: ~25 kHz || || 7.24 mm (corresponding to wheel step 40; 8.3 mm water) || Same position the calibration wheel was. || ADC || 32 || ~7,000 events in peak | ||
|- | |- | ||
| -900 || ST || Rate: ~ | | -900 || ST || || || 0 || Same position the calibration wheel was. || waveforms <br>(~1 GB) || 34 || | ||
|- | |||
| -900 || ST || Rate: ~12 kHz || || 7.24 mm || Upsteam in usual position inside modulator box. || ADC || 35 || ~7,000 events in peak | |||
|- | |||
| -900 || ST || || || 0 || Same position the calibration wheel was. || waveforms <br>(~1.1 GB) || 36 || | |||
|- | |||
| -900 || ST || ADC: ~4373 <br>After beam shift <br>Rate: ~20 kHz || || 13.4 mm (corresponding to wheel step 80; 15.6 mm water) || Same position the calibration wheel was. || ADC || 37 || ~7,000 events in peak | |||
|- | |- | ||
|} | |} |
Revision as of 19:51, 16 August 2016
Dose calibration at Clatterbridge: 0.9 Gy per monitor unit (MU) at 60 MeV.
Day 1 (August 2nd)
Wheel calibration
Equipment setup:
- DC offset: -30 mV
- Record length: 456 ns
- Threshold: 40 LSB
- Trigger: 194 mV
- Gate offset: 10 ns
- Pre-trigger: 50 ns
- Charge sensitivity: 20 fc/LSB
High voltage (V) |
Trigger | Rate & additional information | Collimator size & beam information | Wheel step position | Data recorded | Run number | Comments |
---|---|---|---|---|---|---|---|
-900 | ST |
Beam off:
Beam on:
|
1.98 mm
Beam startup:
Beam settings change:
|
N/A | [startup] | Beam startup and calibration | |
-900 | ST | 0 | ADC | 01 | ~7,000 events in peak | ||
-900 | ST | 0 | waveforms | 03 | ~7,000 events in peak | ||
-900 | ST | 20 | ADC | 05 | ~7,000 events in peak | ||
-900 | ST | 40 | ADC | 06 | ~7,000 events in peak | ||
-900 | ST | 60 | ADC | 07 | ~7,000 events in peak | ||
-900 | ST | 80 | ADC | 08 | ~7,000 events in peak | ||
-900 | ST | 100 | ADC | 09 | ~7,000 events in peak | ||
-900 | ST | 100 | waveforms (~0.5 GB) |
11 | Beam dropped. Repeat in Run 13. | ||
-900 | ST | 100 | waveforms (~1 GB) |
13 | Repeat of Run 10. | ||
-900 | ST | 120 | ADC | 14 | ~7,000 events in peak | ||
-900 | ST | 140 | ADC | 15 | ~7,000 events in peak | ||
-900 | ST | 160 | ADC | 16 | ~6,000 events in peak | ||
-900 | ST | 130 | ADC | 17 | ~7,000 events in peak | ||
-900 | ST | 150 | ADC | 18 | ~6,000 events in peak | ||
-900 | ST | 165 (Just before Bragg peak, which is at wheel step 166.) | ADC | 19 | ~6,000 events in peak. | ||
-900 | ST | 170 | ADC | 20 | Beam dropped. ~4,000 events in peak. Repeat in Run 21. | ||
-900 | ST | 170 | ADC | 21 | Repeat of Run 20. ~4,000 events in peak. | ||
-900 | ST | 173 (Bragg peak fall-off area.) | ADC | 22 | Beam dropped. Repeat in Run 23. | ||
-900 | ST | 173 | ADC | 23 | Repeat of Run 22. ~1.800 events in peak | ||
-900 | ST | 175 | ADC | 24 | |||
-900 | ST | 179 | ADC | 25 | ~30 events in peak. No "peak" apparent; potentially only secondaries. | ||
-900 | ST | 167 (Tip of Bragg peak.) | ADC | 26 | ~7,000 events in peak. | ||
-900 | ST | Rate: 25 kHz (1,000 events in 45 ms) | 0 | ADC | 27 | ~7,000 events in peak. Back to starting point on calibration wheel to compare with Run 01. | |
BEAM OFF. Integrated dose: Dose A: 36.7 MU. Dose B: 36.6 MU. Total beam time run: 99 min. | |||||||
-900 | ST | 0 | ADC | 28 | Background run. Acquisition left over lunch. ~140 events in peak. |
[LUNCH] - approx. 1 hr.
PMMA modulator block cross-check
PMMA modulator blocks of thickness equivalent to particular steps of calibration wheel inserted into beamline at location of wheel (just downstream of nozzle) and upstream inside modulator box to cross-check against data obtained earlier using calibration wheel.
High voltage (V) |
Trigger | Rate & additional information | Collimator size & beam information | PMMA thickness (mm) |
Position of PMMA block | Data recorded | Run number | Comments |
---|---|---|---|---|---|---|---|---|
BEAM ON. Dose monitor operation reset. | ||||||||
-900 | ST | Rate: 20 kHz | Threshold: 40 LSB | 0 (No PMMA. Calibration wheel removed.) | N/A | ADC | 29 | ~7,000 events in peak |
-900 | ST | 0 | N/A | waveforms | 31 (~1.2 GB) |
|||
-900 | ST | Rate: ~25 kHz | 7.24 mm (corresponding to wheel step 40; 8.3 mm water) | Same position the calibration wheel was. | ADC | 32 | ~7,000 events in peak | |
-900 | ST | 0 | Same position the calibration wheel was. | waveforms (~1 GB) |
34 | |||
-900 | ST | Rate: ~12 kHz | 7.24 mm | Upsteam in usual position inside modulator box. | ADC | 35 | ~7,000 events in peak | |
-900 | ST | 0 | Same position the calibration wheel was. | waveforms (~1.1 GB) |
36 | |||
-900 | ST | ADC: ~4373 After beam shift Rate: ~20 kHz |
13.4 mm (corresponding to wheel step 80; 15.6 mm water) | Same position the calibration wheel was. | ADC | 37 | ~7,000 events in peak |
Day 2 (August 3rd)
Scope 2: LeCroy HDO6104 [1], Datasheet Template:PDFlink