ELogs/RaffaellaRadogna: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
Line 70: Line 70:
=== March 2019 ===
=== March 2019 ===
* '''Research'''
* '''Research'''
** '''Clatterbridge accelerator image maps'''
*** directory: /unix/pbt/users/rradogna/ClatterbridgeImageMap/
*** http://www.hep.ucl.ac.uk/pbt/wikiData/clatterbridge/ImageMaps/index.html
** '''Hardware'''
*** Nikon software installed on DAQ laptop
*** patch panels insolation. Look for a better foam tape
*** test run of range telescope setup and camera setup in preparation for next test beam in Heidelberg
** '''GEANT4 PBT group instructions'''
** '''GEANT4 PBT group instructions'''
*** new legacy procedure for CentOS7 using Environment Module and Easy Built modules.
*** implement -b option for bdsim environment
*** scripts updated in /unix/pbt/software/scripts/eb-centos7/
 
*** James and Matthieu tested the new scripts
*** twiki updated: http://www.hep.ucl.ac.uk/pbt/wiki/Software/Geant4/UCL_HEP_Cluster
** run test of Birmingham setup. New laptop + HV (ethernet and USB control) + digitiser.
* '''PBT Meetings'''
* '''PBT Meetings'''
** [http://www.hep.ucl.ac.uk/pbt/wiki/Proton_Calorimetry/Meetings/2019/02/13 12-13th], [http://www.hep.ucl.ac.uk/pbt/wiki/Proton_Calorimetry/Meetings/2019/02/27 26-27th]
** [http://www.hep.ucl.ac.uk/pbt/wiki/Proton_Calorimetry/Meetings/2019/03/06 12-13th], [http://www.hep.ucl.ac.uk/pbt/wiki/Proton_Calorimetry/Meetings/2019/02/27 26-27th]
* '''Commercialization'''
* '''Commercialization'''
** UCL Enterprise Fellowship 13, 20, 27 Feb
** UCL Enterprise Fellowship 13, 20 Mar
** Disclosure form sent to UCLB
 
* '''Others'''
* '''Others'''
** 28th Feb visit to Clatterbridge proton treatment centre
** 19th workshop at Imperial College about Low Energy Ion Beam Diagnostic
** test beam in Birmingam was cancelled
** 5th meeting with Alison Warry and Andrew Gosling at UCLH regarding daily QA
** 15 Feb working from Dublin
** PTCOG registration
** Off sick 5-6 Feb
** 4th working from Bari
** [http://www.pprig.co.uk/pprig/meetings/ PPRIG] Proton Therapy Workshop at NPL: 7th - 8th Feb 2019 (early fee £200)


=== February 2019 ===
=== February 2019 ===

Revision as of 18:54, 21 March 2019

Electronic Log for Raffaella Radogna

ToDo / Ongoing Tasks

Last update: 21 March 2019

Research

  • QuARC data analysis
    • test of data analysis procedure by myself
    • investigate the possibility to run data analysis code with LabView
      • for the final version of the detector we need to run the analysis online (electronics) or offline (LabView)
  • GEANT4 PBT group instructions
    • cancel the old procedure from the pbt area
    • waiting for feedback from James about the -b flag
  • Setup new DAQ macbook
    • fix the resolution issue
  • Hardware
    • Mark the centre of the sensible area on the mylar windows
    • Alignment lines on the second windows

Teaching

  • Ohie MSci report feedback, corrections and mark

Recently Completed Tasks

Research

  • Hardware
    • run test of Birmingham setup. New laptop + HV (ethernet and USB control) + digitiser.
    • patch panels ready
    • Nikon software installed on DAQ laptop
    • patch panels insolation. Look for a better foam tape
  • GEANT4 PBT group instructions
    • testing Matthieu instructions
    • legacy procedure for CentOS7 will use Environment Module and Easy Built installation of geant. Change pbt.sh accordingly.
    • ask James and Matthieu to run their simulation using the new scripts
    • test and update official pbt twiki
    • implement -b option for bdsim environment
  • data analysis
    • learn data anaysis procedure from Laurent (Dec.)
  • Commercialization
    • patent application form (sent to vassilios)

Dates / Next Appointments




Past Completed Tasks

March 2019

  • Research
    • Clatterbridge accelerator image maps
    • Hardware
      • Nikon software installed on DAQ laptop
      • patch panels insolation. Look for a better foam tape
      • test run of range telescope setup and camera setup in preparation for next test beam in Heidelberg
    • GEANT4 PBT group instructions
      • implement -b option for bdsim environment
  • PBT Meetings
  • Commercialization
    • UCL Enterprise Fellowship 13, 20 Mar
    • Disclosure form sent to UCLB
  • Others
    • 19th workshop at Imperial College about Low Energy Ion Beam Diagnostic
    • 5th meeting with Alison Warry and Andrew Gosling at UCLH regarding daily QA
    • PTCOG registration
    • 4th working from Bari

February 2019

  • Research
    • GEANT4 PBT group instructions
    • run test of Birmingham setup. New laptop + HV (ethernet and USB control) + digitiser.
  • PBT Meetings
  • Commercialization
    • UCL Enterprise Fellowship 13, 20, 27 Feb
  • Others
    • 28th Feb visit to Clatterbridge proton treatment centre
    • test beam in Birmingam was cancelled
    • 15 Feb working from Dublin
    • Off sick 5-6 Feb
    • PPRIG Proton Therapy Workshop at NPL: 7th - 8th Feb 2019 (early fee £200)

January 2019

  • Research
    • Setup new DAQ macbook
      • Remote control (tested with private laptop and ethernet connection)
      • EPIX software
      • CAEN software (instruction updated): HV NDT1470 (USB connection, and ethernet connection); digitizer DT5751
      • Nikon D7500 remote control using (for pic and video) digiCamControl and Nikon Camera Control Pro 2.
    • Hardware
      • organise equipment in new boxes, peli cases (HV and digitiser), and external box for Simon's office
      • Zarges case and Peli case new holes
      • new patch panels
  • PBT Meetings
    • for this term we plan meetings with the two MSci students (Saad and Ohie) on Tuesday at 11.00 and with the two MSc students (James and Fernando) on Wednesday at 11.00.
    • 9th, 15-16th, 23rd, 29-30th.
  • Others
    • Java Module9 marking
    • Simon lesson about accelerators at UCLH 10 Jen
    • UCLH PBT Site Visit 22nd Jan
    • 25 Jen working from CERN
    • UCL Enterprise Fellowship 30 Jan

December 2018

  • Research
    • Start learning analysis with Laurent (5th Dec)
    • Discussion about commercialization with Cosylab, 14th Dec. Partecipants: SJ, RR, Marina Fuentes Sainz, Vassilios Albanis, Samo Tuma
    • Organise equipment in new boxes
    • CT scanner operation (no technical details found)
  • Others
    • UCL HEP website personal details
    • 17 Dec day off: INFN Young Researcher project discussion
    • 18 - 21 working from Italy
      • reading PBT simulation twiki documentation
      • reading medical physics litterature (Rep. Prog. Phys. 79 (2016) 096702)
      • Java Module8 extra marking

November 2018

  • Others
    • 6 - 7 Nov days off
    • Innovation and Enterprise lunch meeting (27 Nov)
    • UCL Accademic event for accademic applications (29 Nov, very interesting)

October 2018

  • Research
    • Understand detector operation from Laurent
    • Birmingham test beam (25 - 26 Oct)
    • Heidelberg test beam planning
    • Commercialization and patent application process
      • study WIPO Handbook
      • discussion with Marina Fuentes Sainz (marina.fuentes@ucl.ac.uk — MAPS Faculty Innovation Office) and Vassilios Albanis (v.albanis@uclb.com — UCL Business)
      • meeting at UCLB on 29th (slides), partecipants: SJ, RR, Marina and Vassilios
    • UCLH Proton therapy symposium (slides day 1, day 2)
  • Others
    • UCL registration, NINo, bank account, GP,
    • Lab access (Derek Thomas)
    • UCL welcome event