ELogs/RaffaellaRadogna: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 11: Line 11:
*** HV
*** HV
*** digitizer
*** digitizer
* '''hardware'''
** patch panel connectors size (done)
** grommeths (on my desk, waiting for the assembling)
** mount connectors back


* '''GEANT4 PBT group instructions'''
* '''GEANT4 PBT group instructions'''

Revision as of 14:14, 16 January 2019

Electronic Log for Raffaella Radogna

ToDo / Ongoing

Research

  • setup new DAQ macbook
    • Remote control (done, tested with private laptop and ethernet connection)
    • EPIX software (done)
    • CAEN software
      • HV
      • digitizer
  • hardware
    • patch panel connectors size (done)
    • grommeths (on my desk, waiting for the assembling)
    • mount connectors back
  • GEANT4 PBT group instructions
    • testing Matthieu instructions (done)
    • read official pbt twiki (ongoing)
    • test and update official pbt twiki
  • QARC data analysis
    • learn data anaysis procedure from Laurent (done Dec.)
    • test of data analysis procedure by myself (ongoing in Dec., should restart)
    • investigate the possibility to run data analysis code with LabView
      • for the final version of the detector we need to run the analysis online (electronics) or offline (LabView)
  • Commercialization
    • patent application form (done Dec)

Teaching

  • Java Module9 marking