ELogs/RaffaellaRadogna: Difference between revisions
< ELogs
No edit summary |
No edit summary |
||
Line 11: | Line 11: | ||
*** HV | *** HV | ||
*** digitizer | *** digitizer | ||
* '''hardware''' | |||
** patch panel connectors size (done) | |||
** grommeths (on my desk, waiting for the assembling) | |||
** mount connectors back | |||
* '''GEANT4 PBT group instructions''' | * '''GEANT4 PBT group instructions''' |
Revision as of 14:14, 16 January 2019
Electronic Log for Raffaella Radogna
ToDo / Ongoing
Research
- setup new DAQ macbook
- Remote control (done, tested with private laptop and ethernet connection)
- EPIX software (done)
- CAEN software
- HV
- digitizer
- hardware
- patch panel connectors size (done)
- grommeths (on my desk, waiting for the assembling)
- mount connectors back
- GEANT4 PBT group instructions
- testing Matthieu instructions (done)
- read official pbt twiki (ongoing)
- test and update official pbt twiki
- QARC data analysis
- learn data anaysis procedure from Laurent (done Dec.)
- test of data analysis procedure by myself (ongoing in Dec., should restart)
- investigate the possibility to run data analysis code with LabView
- for the final version of the detector we need to run the analysis online (electronics) or offline (LabView)
- Commercialization
- patent application form (done Dec)
Teaching
- Java Module9 marking