Proton Calorimetry/Meetings/2018/02/07: Difference between revisions
SimonJolly (talk | contribs) (Created page with "== Minutes for UCL Proton Calorimetry Meeting, 7th February 2018 (D17, Physics & Astronomy, UCL) == === Present === '''Simon Jolly''', '''Ruben Saakyan''', '''Matthieu Hentz'''...") |
SimonJolly (talk | contribs) No edit summary |
||
Line 6: | Line 6: | ||
'''SJ''': | '''SJ''': | ||
* | * Meeting with '''LK''' at TU Wien HEPHY on 1st February: | ||
** | ** TU Wien have 26x26mm sensor developed for Belle they want to use for proton CT. | ||
** | ** Sensor is very early in pCT development: readout is slow (~1,000 frames/s). | ||
** | ** Potential for pCT collaboration. | ||
** | ** They are sharing experimental time with us at MedAustron on 22/23 March. | ||
** We will have 6 hours on Thursday night and ~4 hours on Friday night. | |||
** Will make single module measurements for them: MedAustron rate and pCT calorimetry. | |||
** Accommodation is booked: 4 rooms in Orange Wings (close to MedAustron). | |||
* Both Zarges enclosures are finally here: | |||
** Smaller one is painted: waiting on specs from ISDI to choose patch panel connectors. | |||
** Larger one just arrived: Derek will paint tomorrow. | |||
'''LK''': | |||
* Running tests on [http://www.hep.ucl.ac.uk/pbt/wikiData/presentations/2018/LK20180207_ScintillatorSheetTestsWithLED.pdf Scintillator Sheets using LED]: | |||
** First tests with Nikon DSLR carried out on 5/6 February. | |||
** Some sheets not properly painted, so light leaks in around fibre. | |||
** Camera highly adjustable: '''RS''' suggests running tests with LED settings used for PRIAPUS saturation. | |||
** Lens aberrations seen with high light levels. | |||
** Variation seen across sheet but average light level approximately the same for all sheets. | |||
* ''To Do'': | * ''To Do'': | ||
** | ** Some sheets need repainting: will speak to '''Derek Attree'''. | ||
** Chasing up ISDI! | |||
** | ** Test USB3 patch panel connector. | ||
** Finish off analysis. | |||
** Add Remote Desktop information to Wiki. | |||
''' | '''ABF''': | ||
* ''To Do'': | * ''To Do'': | ||
** | ** Continue LED tests: rerun with settings that saturated PRIAPUS; set up radioactive source. | ||
** ''' | ** Label scintillator sheets. | ||
** Polish scintillator sheets. | |||
** Analyse LED data. | |||
'''RS''': | |||
* Had meeting with Hamamatsu. | |||
* 2 potential products available: | |||
** Linear image sensor. | |||
** Position sensitive linear image sensor. | |||
* Both active pixel sensor strips. | |||
* Industrial devices: less than £50 each! | |||
* Readout available but expensive (£800). | |||
'''MH''': | '''MH''': | ||
* | * Focussing on buffered event writing in Geant4 to speed up simulations. | ||
* | * Fixed issue by avoiding use of pointers: needed a custom accumulator class. | ||
** | * Factor of 30 speed up with buffering! | ||
* Code needs tidying up.. | |||
* | * ''To Do'': | ||
* | ** Tidy up Geant4 buffering code. | ||
** Update Wiki. | |||
'''JS''': | |||
* [http://www.hep.ucl.ac.uk/pbt/wikiData/presentations/2018/JS_07_02_18.pptx Reanalysed scintillator sheet thicknesses after painting]: | |||
** Difference in thickness of 10 to 70 microns after painting. | |||
* ''To Do'': | * ''To Do'': | ||
** | ** Write up scintillator sheet measurements on Wiki page. | ||
** | ** CAD import/export in Geant4. |
Latest revision as of 14:59, 7 February 2018
Minutes for UCL Proton Calorimetry Meeting, 7th February 2018 (D17, Physics & Astronomy, UCL)
Present
Simon Jolly, Ruben Saakyan, Matthieu Hentz, Jordan Silverman, Anastasia Basharina-Freshville, Laurent Kelleter
SJ:
- Meeting with LK at TU Wien HEPHY on 1st February:
- TU Wien have 26x26mm sensor developed for Belle they want to use for proton CT.
- Sensor is very early in pCT development: readout is slow (~1,000 frames/s).
- Potential for pCT collaboration.
- They are sharing experimental time with us at MedAustron on 22/23 March.
- We will have 6 hours on Thursday night and ~4 hours on Friday night.
- Will make single module measurements for them: MedAustron rate and pCT calorimetry.
- Accommodation is booked: 4 rooms in Orange Wings (close to MedAustron).
- Both Zarges enclosures are finally here:
- Smaller one is painted: waiting on specs from ISDI to choose patch panel connectors.
- Larger one just arrived: Derek will paint tomorrow.
LK:
- Running tests on Scintillator Sheets using LED:
- First tests with Nikon DSLR carried out on 5/6 February.
- Some sheets not properly painted, so light leaks in around fibre.
- Camera highly adjustable: RS suggests running tests with LED settings used for PRIAPUS saturation.
- Lens aberrations seen with high light levels.
- Variation seen across sheet but average light level approximately the same for all sheets.
- To Do:
- Some sheets need repainting: will speak to Derek Attree.
- Chasing up ISDI!
- Test USB3 patch panel connector.
- Finish off analysis.
- Add Remote Desktop information to Wiki.
ABF:
- To Do:
- Continue LED tests: rerun with settings that saturated PRIAPUS; set up radioactive source.
- Label scintillator sheets.
- Polish scintillator sheets.
- Analyse LED data.
RS:
- Had meeting with Hamamatsu.
- 2 potential products available:
- Linear image sensor.
- Position sensitive linear image sensor.
- Both active pixel sensor strips.
- Industrial devices: less than £50 each!
- Readout available but expensive (£800).
MH:
- Focussing on buffered event writing in Geant4 to speed up simulations.
- Fixed issue by avoiding use of pointers: needed a custom accumulator class.
- Factor of 30 speed up with buffering!
- Code needs tidying up..
- To Do:
- Tidy up Geant4 buffering code.
- Update Wiki.
JS:
- Reanalysed scintillator sheet thicknesses after painting:
- Difference in thickness of 10 to 70 microns after painting.
- To Do:
- Write up scintillator sheet measurements on Wiki page.
- CAD import/export in Geant4.