Proton Calorimetry/Meetings/2017/05/24: Difference between revisions
SimonJolly (talk | contribs) (Created page with "== Minutes for UCL Proton Calorimetry Meeting, 24th May 2017 (D17, Physics & Astronomy, UCL) == === Present === '''Simon Jolly''', '''Laurent Kelleter''', '''Anastasia Basharin...") |
SimonJolly (talk | contribs) No edit summary |
||
Line 13: | Line 13: | ||
* [http://www.hep.ucl.ac.uk/pbt/wikiData/presentations/2017/ABF_LEMO_splitter_tests_24.05.17.pdf Looking at effect of splitting signals for remote testing]: | * [http://www.hep.ucl.ac.uk/pbt/wikiData/presentations/2017/ABF_LEMO_splitter_tests_24.05.17.pdf Looking at effect of splitting signals for remote testing]: | ||
** Need to split signal from PMT to Caen digitiser and scope with 50 Ω splitter. | ** Need to split signal from PMT to Caen digitiser and scope with 50 Ω splitter. | ||
** Spectra become less Gaussian and more difficult to fit when using splitter. | |||
** σ<sub>pedestal</sub> and σ<sub>width</sub> very similar... | |||
** Effects get worse with lower ADC counts. | |||
** Current 50 Ω splitter will '''not''' work for our purposes. | |||
* Need to find a solution in order to monitor signal in 2 places: | |||
** Make an active splitter? | |||
** Get a 50 Ω BNC splitter to reduce number of cables and connectors. | |||
** '''SJ''' suggest contacting '''Samer Al-Kilani''' and '''Izzat Darwazeh''' (UCL EE) for optimal cables and splitting. | |||
'''LK''': | '''LK''': | ||
* [http://www.hep.ucl.ac.uk/pbt/wikiData/presentations/2017/ | * [http://www.hep.ucl.ac.uk/pbt/wikiData/presentations/2017/LK20170524_SegCal_Update.pdf Update on segmented calorimeter simulations]: | ||
** | ** Corrected Physics List to include nuclear interactions. | ||
** | ** Simulations more accurate due to inclusion of nuclear build-up: fit now slightly worse as a result. | ||
**'''SJ''' agrees that these effects should be included in the model, but probably not at this stage. | |||
* | |||
* '''SJ''' | |||
Latest revision as of 13:58, 24 May 2017
Minutes for UCL Proton Calorimetry Meeting, 24th May 2017 (D17, Physics & Astronomy, UCL)
Present
Simon Jolly, Laurent Kelleter, Anastasia Basharina-Freshville, Jordan Silverman
ABF:
- Full data acquisition now running completely over the network:
- Single 50m cat6a cable runs into treatment room.
- Network hub in treatment room connects to DAQ PC/laptop and scope.
- DAQ PC connects to Caen digitiser, HV and detector emulator.
- Connect to scope and DAQ PC via Windows Remote Desktop.
- Looking at effect of splitting signals for remote testing:
- Need to split signal from PMT to Caen digitiser and scope with 50 Ω splitter.
- Spectra become less Gaussian and more difficult to fit when using splitter.
- σpedestal and σwidth very similar...
- Effects get worse with lower ADC counts.
- Current 50 Ω splitter will not work for our purposes.
- Need to find a solution in order to monitor signal in 2 places:
- Make an active splitter?
- Get a 50 Ω BNC splitter to reduce number of cables and connectors.
- SJ suggest contacting Samer Al-Kilani and Izzat Darwazeh (UCL EE) for optimal cables and splitting.
LK:
- Update on segmented calorimeter simulations:
- Corrected Physics List to include nuclear interactions.
- Simulations more accurate due to inclusion of nuclear build-up: fit now slightly worse as a result.
- SJ agrees that these effects should be included in the model, but probably not at this stage.