Proton Calorimetry/Meetings/2025/01/29: Difference between revisions
(Created page with "== Minutes for UCL Proton Beam Therapy Group Meetings, 29th January == === Present === '''Joe Bateman''', '''Sonia Escribano''', '''Simon Jolly''', '''Febian ''', '''Raffaella Radogna (via Teams)''' === Febian === * First part of presentation on understanding of PBT, the QuARC and associated electronics === Raffaella Radogna === * Few discussions in Bari about updated design * Harry needs to invite Raffy to fusion hub C...") |
No edit summary |
||
Line 9: | Line 9: | ||
* First part of presentation on understanding of PBT, the QuARC and associated electronics | * First part of presentation on understanding of PBT, the QuARC and associated electronics | ||
=== [[ELogs/RaffaellaRadogna|Raffaella Radogna]] === | |||
* Few discussions in Bari about updated design | * Few discussions in Bari about updated design | ||
* Harry needs to invite Raffy to fusion hub CAD | * Harry needs to invite Raffy to fusion hub CAD | ||
Line 37: | Line 37: | ||
** 2 calibrated files | ** 2 calibrated files | ||
** 2 fitted files | ** 2 fitted files | ||
=== [[ELogs/JoeBateman|Joe Bateman]] === | === [[ELogs/JoeBateman|Joe Bateman]] === |
Latest revision as of 17:24, 4 February 2025
Minutes for UCL Proton Beam Therapy Group Meetings, 29th January
Present
Joe Bateman, Sonia Escribano, Simon Jolly, Febian , Raffaella Radogna (via Teams)
Febian
- First part of presentation on understanding of PBT, the QuARC and associated electronics
Raffaella Radogna
- Few discussions in Bari about updated design
- Harry needs to invite Raffy to fusion hub CAD
Sonia Escribano
- Scintillators
- 175 sheets have been sent to Wayne and John for machining
- Now have 183 sheets left in lab
- In future will need 32 x1.5mm sheets for clatterbridge but will require new ddc board with PD's interleaved
- Therefore can use some of the left scintillators for this module potentially? So box up left over scintillator sheets
- Photodiodes:
- Currently have 192 in use - need 256 for 4 modules
- Joe has quote for 100
- Smoke coming from clatterbridge rev b board when testing
- Something coming into the LDO has blown
- Need to check polarity of PDs on revB boards
- PDs on revD boards work except 1
- USB104 2 working, 1 is not programmed, 4th board that was Febian working with is now working
- Board4 no longer resetting but when trying to acquire data and cable is in PMODA it doesn't ready any measurements
- All calibration errors have now been fixed
- Just have a new file that calculates a file of the scaling factors per PD boards i.e. one file of scaling factors per PD board
- For calibration files - reversing not necessary as doing shoot through from both sides
- Would be good for own analysis to have one file for each side
- 1 hex file
- 2 calibrated files
- 2 fitted files
Joe Bateman
- Fixed discrepancy between TOPAS and FRED Bragg peak for 154.97 MeV pencil beam (due to differences between energy spread definition in the codes).
- Improved agreement between two simulation codes seen now, although discrepancies increase as energy of PB decreases.
- Plotted 2D profiles and SOBP for QuADProBe and DICOM param for run33 in TOPAS and FRED
- Plotted 2D profiles and SOBP for DICOM params in TOPAS and FRED for 3by3 and 5by5 10 Gy box fields - although fields look smeared out
- ICOM beam size is at isocentre - not at source so need to back project somehow
- Planning QuADpProBe paper for Frontiers special edition