Proton Calorimetry/Meetings/2021/03/31: Difference between revisions
SaadShaikh (talk | contribs) |
SaadShaikh (talk | contribs) |
||
Line 14: | Line 14: | ||
*FTDI and ROOT code now working on DAQ laptop running Big Sur. | *FTDI and ROOT code now working on DAQ laptop running Big Sur. | ||
*Still need to benchmark FTDI code on Windows. | *Still need to benchmark FTDI code on Windows. | ||
*Will get some beam time at UCLH on 15th April. | |||
=== [[ELogs/FernPannell|Fern Pannell]] === | === [[ELogs/FernPannell|Fern Pannell]] === |
Revision as of 12:15, 31 March 2021
Minutes for UCL Proton Calorimetry Meetings, 31st March
Present
Simon Jolly, Raffaella Radogna, Saad Shaikh, Fern Pannell
Saad Shaikh
- Shipment to CosyLab dropped off at UCL, waiting for confirmation with tracking details.
- Tested signal quality of daisy-chain at UCL with Simon and Izzat.
- Observe severe signal degradation with 3 and 4 boards.
- Izzat emphasised having clean power supplies, along with fixing likely signal transmission/reflection issues.
- Will meet Simon at UCL tomorrow to repeat tests and film results.
- Updated DDC232 noise analysis routines to work with FTDI saved data, cleaning things up and improving efficiency.
- FTDI and ROOT code now working on DAQ laptop running Big Sur.
- Still need to benchmark FTDI code on Windows.
- Will get some beam time at UCLH on 15th April.