Proton Calorimetry/Experimental Runs/2021: Difference between revisions
Jump to navigation
Jump to search
SaadShaikh (talk | contribs) (Created page with "; Daisy Chain Tests of 2nd DDC232 Prototype : Debugging daisy chain problems in the 2nd DDC232 prototype, using a board with resistors instead of photodiodes.") |
SaadShaikh (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
; [[/Mar4|Daisy Chain Tests of 2nd DDC232 Prototype]] | ; [[/Apr15|UCLH 15th April 2021]] | ||
: Experimental measurements at UCLH. First beam test with photodiode DAQ system. | |||
: Validate photodiode range reconstruction against CMOS sensor. | |||
; [[/Apr1|Daisy Chain Tests of 2nd DDC232 Prototype. 1st April.]] | |||
: Debugging daisy chain problems in the 2nd DDC232 prototype, using a board with resistors instead of photodiodes. | |||
; [[/Mar4|Daisy Chain Tests of 2nd DDC232 Prototype. 4th March.]] | |||
: Debugging daisy chain problems in the 2nd DDC232 prototype, using a board with resistors instead of photodiodes. | : Debugging daisy chain problems in the 2nd DDC232 prototype, using a board with resistors instead of photodiodes. |
Revision as of 13:48, 21 April 2021
- UCLH 15th April 2021
- Experimental measurements at UCLH. First beam test with photodiode DAQ system.
- Validate photodiode range reconstruction against CMOS sensor.
- Daisy Chain Tests of 2nd DDC232 Prototype. 1st April.
- Debugging daisy chain problems in the 2nd DDC232 prototype, using a board with resistors instead of photodiodes.
- Daisy Chain Tests of 2nd DDC232 Prototype. 4th March.
- Debugging daisy chain problems in the 2nd DDC232 prototype, using a board with resistors instead of photodiodes.