Proton Calorimetry/Meetings/2020/10/07: Difference between revisions
SaadShaikh (talk | contribs) (Created page with "== Minutes for UCL Proton Calorimetry Meetings, 7th October == === Present === '''Raffaella Radogna''', '''Saad Shaikh''', '''Fern Pannell''' === [[ELogs/RaffaellaRadogna|Raff...") |
SaadShaikh (talk | contribs) |
||
Line 16: | Line 16: | ||
**Tested daisy-chain of current boards – doesn't work (as expected). | **Tested daisy-chain of current boards – doesn't work (as expected). | ||
**Informed Marko of desired changes and Simon signed off on production of 4 more boards. | **Informed Marko of desired changes and Simon signed off on production of 4 more boards. | ||
*Tested photodiodes on detector with LED - low signal level observed and noise increases with integration time. | |||
*Nexys Video board has arrived, will start testing this before holiday. | *Nexys Video board has arrived, will start testing this before holiday. | ||
*Will be on holiday for weeks beginning 12th and 19th October. | *Will be on holiday for weeks beginning 12th and 19th October. | ||
=== [[ELogs/FernPannell|Fern Pannell]] === | === [[ELogs/FernPannell|Fern Pannell]] === |
Revision as of 15:14, 8 October 2020
Minutes for UCL Proton Calorimetry Meetings, 7th October
Present
Raffaella Radogna, Saad Shaikh, Fern Pannell
Raffaella Radogna
Saad Shaikh
- Delivered transfer talk and completed mini-viva.
- Passed upgrade!
- Will have feedback session with Jim on 9/10/20.
- Completed Upgrade and 12-month research log entries.
- Fixed bugs and improved DAQ – using buffer size on CoolTerm equal to number of bytes per measurement cycle allows CoolTerm to keep up.
- Added support for daisy-chain in FPGA and plotting code (assuming photodiode-resistor-input map of current prototype boards).
- Tested daisy-chain of current boards – doesn't work (as expected).
- Informed Marko of desired changes and Simon signed off on production of 4 more boards.
- Tested photodiodes on detector with LED - low signal level observed and noise increases with integration time.
- Nexys Video board has arrived, will start testing this before holiday.
- Will be on holiday for weeks beginning 12th and 19th October.