Proton Calorimetry/Experimental Runs/2016/Aug2-3: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
Line 7: Line 7:
=== Wheel calibration ===
=== Wheel calibration ===
Equipment setup:
Equipment setup:
* DC offset: -30 mV
* DC offset: -30 mV
* Record length: 456 ns
* Record length: 456 ns
* Threshold: 40 LSB
* Threshold: 40 LSB
* Trigger: 194 mV
* Trigger: 194 mV
* Gate offset: 10 ns
* Gate offset: 10 ns
* Pre-trigger: 50 ns
* Pre-trigger: 50 ns
* Charge sensitivity: 20 fc/LSB
* Charge sensitivity: 20 fc/LSB


{| class="wikitable"
{| class="wikitable"
Line 22: Line 22:
|
|
Beam off:
Beam off:
* I: 150.51 μ
* I: 150.51 μ
Beam on:
Beam on:
* Rate: 300 kHz on startup.
* Rate: 300 kHz on startup.
* Rate: 25 kHz at -100 mV.
* Rate: 25 kHz at -100 mV.
| 1.98 mm
| 1.98 mm
Beam startup:
Beam startup:
* Arc current: 750 mV
* Arc current: 750 mV
* Gas source: 0.67 cc/min
* Gas source: 0.67 cc/min
Beam settings change:
Beam settings change:
* Arc current: 50 μ
* Arc current: 50 μ
* Gas source: 0.39 cc/min
* Gas source: 0.39 cc/min
* Dose rate: 0.1 MU/min
* Dose rate: 0.1 MU/min
| N/A || || [startup] || Beam startup and calibration
| N/A || || [startup] || Beam startup and calibration
|-
|-
Line 50: Line 50:
| -900 || ST ||  ||  || 100 || ADC || 09 || ~7,000 events in peak
| -900 || ST ||  ||  || 100 || ADC || 09 || ~7,000 events in peak
|-
|-
| -900 || ST ||  ||  || 100 || waveforms (~0.5 GB) || 11 || Beam dropped. Repeat in Run 13.
| -900 || ST ||  ||  || 100 || waveforms <br>(~0.5&nbsp;GB) || 11 || Beam dropped. Repeat in Run 13.
|-
|-
| -900 || ST ||  ||  || 100 || waveforms (~1 GB) || 13 || Repeat of Run 10.
| -900 || ST ||  ||  || 100 || waveforms <br>(~1&nbsp;GB) || 13 || Repeat of Run 10.
|-
|-
| -900 || ST ||  ||  || 120 || ADC || 14 || ~7,000 events in peak
| -900 || ST ||  ||  || 120 || ADC || 14 || ~7,000 events in peak
Line 80: Line 80:
| -900 || ST ||  ||  || 167 (Tip of Bragg peak.) || ADC || 26 || ~7,000 events in peak.
| -900 || ST ||  ||  || 167 (Tip of Bragg peak.) || ADC || 26 || ~7,000 events in peak.
|-
|-
| -900 || ST || Rate: 25 kHz (1,000 events in 45 ms) ||  || 0 || ADC || 27 || ~7,000 events in peak. Back to starting point on calibration wheel to compare with Run 01.
| -900 || ST || Rate: 25&nbsp;kHz (1,000 events in 45&nbsp;ms) ||  || 0 || ADC || 27 || ~7,000 events in peak. Back to starting point on calibration wheel to compare with Run 01.
|-
|-
| align="center" colspan="8" style="background:#ffcccc" | BEAM OFF. <br><b>Integrated dose:</b> Dose A: 36.7 MU. Dose B: 36.6 MU. <br><b>Total beam time run:</b> 99 min.
| align="center" colspan="8" style="background:#ffcccc" | BEAM OFF. <br><b>Integrated dose:</b> Dose A: 36.7&nbsp;MU. Dose B: 36.6&nbsp;MU. <br><b>Total beam time run:</b> 99&nbsp;min.
|-
|-
| -900 || ST ||  ||  || 0 || ADC || 28 || Background run. Acquisition left over lunch. ~140 events in peak.
| -900 || ST ||  ||  || 0 || ADC || 28 || Background run. Acquisition left over lunch. ~140 events in peak.
Line 88: Line 88:
|}
|}


[<b>LUNCH</b>] - approx. 1 hr.
[<b>LUNCH</b>] - approx. 1&nbsp;hr.


=== PMMA modulator block cross-check ===
=== PMMA modulator block cross-check ===

Revision as of 19:39, 16 August 2016

Dose calibration at Clatterbridge: 0.9 Gy per monitor unit (MU) at 60 MeV.

Day 1 (August 2nd)

Wheel calibration

Equipment setup:

  • DC offset: -30 mV
  • Record length: 456 ns
  • Threshold: 40 LSB
  • Trigger: 194 mV
  • Gate offset: 10 ns
  • Pre-trigger: 50 ns
  • Charge sensitivity: 20 fc/LSB
High voltage
(V)
Trigger Rate & additional information Collimator size & beam information Wheel step position Data recorded Run number Comments
-900 ST

Beam off:

  • I: 150.51 μ

Beam on:

  • Rate: 300 kHz on startup.
  • Rate: 25 kHz at -100 mV.
1.98 mm

Beam startup:

  • Arc current: 750 mV
  • Gas source: 0.67 cc/min

Beam settings change:

  • Arc current: 50 μ
  • Gas source: 0.39 cc/min
  • Dose rate: 0.1 MU/min
N/A [startup] Beam startup and calibration
-900 ST 0 ADC 01 ~7,000 events in peak
-900 ST 0 waveforms 03 ~7,000 events in peak
-900 ST 20 ADC 05 ~7,000 events in peak
-900 ST 40 ADC 06 ~7,000 events in peak
-900 ST 60 ADC 07 ~7,000 events in peak
-900 ST 80 ADC 08 ~7,000 events in peak
-900 ST 100 ADC 09 ~7,000 events in peak
-900 ST 100 waveforms
(~0.5 GB)
11 Beam dropped. Repeat in Run 13.
-900 ST 100 waveforms
(~1 GB)
13 Repeat of Run 10.
-900 ST 120 ADC 14 ~7,000 events in peak
-900 ST 140 ADC 15 ~7,000 events in peak
-900 ST 160 ADC 16 ~6,000 events in peak
-900 ST 130 ADC 17 ~7,000 events in peak
-900 ST 150 ADC 18 ~6,000 events in peak
-900 ST 165 (Just before Bragg peak, which is at wheel step 166.) ADC 19 ~6,000 events in peak.
-900 ST 170 ADC 20 Beam dropped. ~4,000 events in peak. Repeat in Run 21.
-900 ST 170 ADC 21 Repeat of Run 20. ~4,000 events in peak.
-900 ST 173 (Bragg peak fall-off area.) ADC 22 Beam dropped. Repeat in Run 23.
-900 ST 173 ADC 23 Repeat of Run 22. ~1.800 events in peak
-900 ST 175 ADC 24
-900 ST 179 ADC 25 ~30 events in peak. No "peak" apparent; potentially only secondaries.
-900 ST 167 (Tip of Bragg peak.) ADC 26 ~7,000 events in peak.
-900 ST Rate: 25 kHz (1,000 events in 45 ms) 0 ADC 27 ~7,000 events in peak. Back to starting point on calibration wheel to compare with Run 01.
BEAM OFF.
Integrated dose: Dose A: 36.7 MU. Dose B: 36.6 MU.
Total beam time run: 99 min.
-900 ST 0 ADC 28 Background run. Acquisition left over lunch. ~140 events in peak.

[LUNCH] - approx. 1 hr.

PMMA modulator block cross-check

PMMA modulator blocks of thickness equivalent to particular steps of calibration wheel inserted into beamline at location of wheel (just downstream of nozzle) and upstream inside modulator box to cross-check against data obtained earlier using calibration wheel.

High voltage
(V)
Trigger Rate & additional information Collimator size & beam information PMMA thickness
(mm)
Position of PMMA block Data recorded Run number Comments
BEAM ON.
Dose monitor operation reset.
-900 ST Rate: 20 kHz Threshold: 40 LSB 0 (No PMMA. Calibration wheel removed.) N/A ADC 29 ~7,000 events in peak
-900 ST 0 N/A waveforms 31
(~1.2 GB)
-900 ST 7.24 mm (corresponding to wheel step 40; 8.3 mm water) Same position the calibration wheel was. ADC 32 ~7,000 events in peak
-900 ST Rate: ~25 kHz 0 Same position the calibration wheel was. waveforms
(~1 GB)
34

Day 2 (August 3rd)

Scope 2: LeCroy HDO6104 [1], Datasheet Template:PDFlink