ELogs/LaurentKelleter: Difference between revisions
< ELogs
No edit summary |
No edit summary |
||
Line 11: | Line 11: | ||
=== Other === | === Other === | ||
* | * IoP meeting | ||
** Register. Deadline 11 March | |||
** Make talk | |||
* Net HIT test beam 13-15th March: | * Net HIT test beam 13-15th March: | ||
** Book flights | ** Book flights | ||
Line 19: | Line 21: | ||
** Book flights | ** Book flights | ||
* Simulate Bragg curve in realistic range telescope with correct sheet and paint thickness | * Simulate Bragg curve in realistic range telescope with correct sheet and paint thickness | ||
* Analyse MedAustron data with carbon. Plot with curves from Loic. | * Analyse MedAustron data with carbon. Plot with curves from Loic. | ||
* Make QB curve fit better (fit hostogram template?) | * Make QB curve fit better (fit hostogram template?) | ||
* Finish and submit Quenched Bragg curve paper. Draft is with Simon for revision | * Finish and submit Quenched Bragg curve paper. Draft is with Simon for revision | ||
* Write Range telescope paper about MedAustron data | * Write Range telescope paper about MedAustron data | ||
* Analyse HIT data | * Analyse HIT data. Find a way to go from Bragg peak to 80% fall-off depth | ||
* Organise IBA visit | * Organise IBA visit | ||
* Build analytical model for Helium beam (talk to Felix Horst at GSI?) | |||
* Build analytical model for Helium beam (talk to Felix Horst at GSI) | |||
* Get Proton and Carbon Bragg curve data from Lenny | * Get Proton and Carbon Bragg curve data from Lenny | ||
* Update Geant4 to easybuild version (make visualisation work again) | * Update Geant4 to easybuild version (make visualisation work again) | ||
* Write a PhD thesis | * Write a PhD thesis | ||
Line 35: | Line 35: | ||
== Completed == | == Completed == | ||
* Submitted abstract to IoP meeting 8-9th April (3rd year talk) | |||
* Paid fee for OMA school in Vienna (300£, 1st March deadline) | * Paid fee for OMA school in Vienna (300£, 1st March deadline) | ||
* Finished and submitted OMA deliverable report | * Finished and submitted OMA deliverable report |
Revision as of 19:12, 18 February 2019
Electronic Log for Laurent Kelleter
To Do
Urgent
- Send description of career plan and prospects (OMA) to Michelle and Samantha
Other
- IoP meeting
- Register. Deadline 11 March
- Make talk
- Net HIT test beam 13-15th March:
- Book flights
- Think of measurements (after we know if we get high energy helium and the hip phantom)
- Vienna OMA school:
- Make poster
- Book flights
- Simulate Bragg curve in realistic range telescope with correct sheet and paint thickness
- Analyse MedAustron data with carbon. Plot with curves from Loic.
- Make QB curve fit better (fit hostogram template?)
- Finish and submit Quenched Bragg curve paper. Draft is with Simon for revision
- Write Range telescope paper about MedAustron data
- Analyse HIT data. Find a way to go from Bragg peak to 80% fall-off depth
- Organise IBA visit
- Build analytical model for Helium beam (talk to Felix Horst at GSI?)
- Get Proton and Carbon Bragg curve data from Lenny
- Update Geant4 to easybuild version (make visualisation work again)
- Write a PhD thesis
Completed
- Submitted abstract to IoP meeting 8-9th April (3rd year talk)
- Paid fee for OMA school in Vienna (300£, 1st March deadline)
- Finished and submitted OMA deliverable report
- Finished draft of Quenched Bragg curve paper.
- Sumitted build-up paper to Medical Physics
- Finished build-up paper
- Write short biography and poster for world cancer day
- Write abstract for PTCOG with Lenny about mixed beams
- Submitted abstract PTCOG on QUARC
- Analyse mixed-beam data for Lenny's HIT seminar (19th January)
- Update OMA Career development plan
- Update OMA brochure
Dates 2019
Date | Event |
---|---|
07-08/02 | PPRIG |
01/03 | Day off |
most likely in March | Test beam at HIT |
28/03-07/04 | OMA School Vienna |
Around Easter | IBA secondment (one week) |
20-29/05 | Holiday |
10-15/06 | PTCOG |
23-28/06 | OMA school Liverpool |
31/07-06/08 | Holiday |
04-06/09 | OMA Final conference in Seville |
30/09 | End of contract |
31/12 | End of extension |