ELogs/SaadShaikh: Difference between revisions
< ELogs
SaadShaikh (talk | contribs) No edit summary |
SaadShaikh (talk | contribs) No edit summary |
||
Line 5: | Line 5: | ||
=== High Priority === | === High Priority === | ||
* Matched tracker and calorimeter data: manual binning for X, Y, Count histograms to find average energy in each bin to then produce 4D histogram. | * Matched tracker and calorimeter data: manual binning for X, Y, Count histograms to find average energy in each bin to then produce 4D histogram. | ||
* Produce poster for PPRIG of experiment with single-module calorimeter and PRaVDA tracker. | * Produce poster for PPRIG of experiment with single-module calorimeter and PRaVDA tracker. | ||
Line 28: | Line 27: | ||
* Progress report. | * Progress report. | ||
* Improved LeCroy & Caen matching by finding x-scale factor through chi-square minimisation. | * Improved LeCroy & Caen matching by finding x-scale factor through chi-square minimisation. | ||
* All runs from first Birmingham put through matching algorithm. Energy spectra, 2D tracker histograms, and 3D XY, XE & YE histograms plotted for all runs. | |||
== Dates 2019 == | == Dates 2019 == |
Revision as of 22:03, 17 January 2019
Electronic Log for Saad Shaikh
To Do
High Priority
- Matched tracker and calorimeter data: manual binning for X, Y, Count histograms to find average energy in each bin to then produce 4D histogram.
- Produce poster for PPRIG of experiment with single-module calorimeter and PRaVDA tracker.
Low Priority
- Investigate y-scale factor correction with chi-square minimisation.
- Plot x-scale factors against y-scale factors divided by number of counts.
- Re-attempt LeCroy scope dead-time measurements.
- Start final report in February.
Completed
- Literature review.
- First Birmingham experimental run.
- Wrote code to load and plot Caen digitiser data in histograms.
- Overhauled LeCroy data analysis routines: (short region) double baseline sigma testing, dynamic integration window allocation, empty acquisition checks.
- Wrote code to scale and plot LeCroy & Caen data onto single plot, using approximate x and y-scale factors.
- Wrote code to load and plot PRaVDA data in 2D histograms.
- Wrote code to correlate tracker and calorimeter measurements, to produce a list of events with X, Y, E coordinates.
- Wrote code to plot matched events into various 3D histograms: XY, XE, YE
- Progress report.
- Improved LeCroy & Caen matching by finding x-scale factor through chi-square minimisation.
- All runs from first Birmingham put through matching algorithm. Energy spectra, 2D tracker histograms, and 3D XY, XE & YE histograms plotted for all runs.
Dates 2019
Date | Event |
---|---|
07/02 - 08/02 | PPRIG |
11/02 - 12/02 | UCL PhD Interviews |
22/03 | Final Report Deadline |
03/06-07/06 | MSci Presentation Week |