Proton Calorimetry/Meetings/2017/08/23: Difference between revisions
SimonJolly (talk | contribs) (Created page with "== Minutes for UCL Proton Calorimetry Meeting, 23rd August 2017 (D17, Physics & Astronomy, UCL) == === Present === '''Simon Jolly''', '''Laurent Kelleter''', '''Anastasia Basha...") |
SimonJolly (talk | contribs) No edit summary |
||
Line 12: | Line 12: | ||
* Working on transfer report. | * Working on transfer report. | ||
* Will generate plot to show comparison for layered calorimeter between measured light output, reconstructed quenched Bragg curve and Bortfeld formula. | * Will generate plot to show comparison for layered calorimeter between measured light output, reconstructed quenched Bragg curve and Bortfeld formula. | ||
=== Planning for Birmingham === | |||
* Trip to Birmingham on 23rd (today) was cancelled due to cyclotron issues. | |||
* Rescheduled for Friday 25th. | |||
* Need to make measurements with each scintillator sheet at front of scintillator stack to calibrate light output: | |||
*+ Arrange scintillator sheets with 3 mm sheets at the front and 3.8 mm sheets in the middle; remove 10 sheets. | |||
*+ Make a measurement with the sheets in this configuration. | |||
*+ For each group of 3 sheets, take the front sheet out, move the 2nd and 3rd sheets forward and insert the first sheet at the back of the group. So the 2 groups of scintillators that are grouped {(1,2,3),(1,2,3)} are now grouped {(2,3,1),(2,3,1)}. | |||
*+ Retake the measurement. |
Revision as of 14:09, 23 August 2017
Minutes for UCL Proton Calorimetry Meeting, 23rd August 2017 (D17, Physics & Astronomy, UCL)
Present
Simon Jolly, Laurent Kelleter, Anastasia Basharina-Freshville
ABF:
- Will start writing paper today.
- Will clone git repository from CVS.
LK:
- Working on transfer report.
- Will generate plot to show comparison for layered calorimeter between measured light output, reconstructed quenched Bragg curve and Bortfeld formula.
Planning for Birmingham
- Trip to Birmingham on 23rd (today) was cancelled due to cyclotron issues.
- Rescheduled for Friday 25th.
- Need to make measurements with each scintillator sheet at front of scintillator stack to calibrate light output:
- + Arrange scintillator sheets with 3 mm sheets at the front and 3.8 mm sheets in the middle; remove 10 sheets.
- + Make a measurement with the sheets in this configuration.
- + For each group of 3 sheets, take the front sheet out, move the 2nd and 3rd sheets forward and insert the first sheet at the back of the group. So the 2 groups of scintillators that are grouped {(1,2,3),(1,2,3)} are now grouped {(2,3,1),(2,3,1)}.
- + Retake the measurement.