# Implementing a text-entry box for the number of photodiodes instead | |||
# Implementing two text-entry boxes for the minimum (0mm) and maximum range which updates automatically when the number of photodiodes is entered | # Implementing two text-entry boxes for the minimum (0mm) and maximum range which updates automatically when the number of photodiodes is entered | ||
#* The x-axis must show millimetres, not photodiode numbers because the important quantity is the Water Equivalent Thickness that the protons have penetrated | #* The x-axis must show millimetres, not photodiode numbers because the important quantity is the Water Equivalent Thickness that the protons have penetrated | ||
Line 24: | Line 25: | ||
* Computing the photodiode intensity bar chart using the Papa Parse | * Computing the photodiode intensity bar chart using the Papa Parse | ||
* Adding axes to the photodiode intensity bar chart | * Adding axes to the photodiode intensity bar chart | ||
* Getting rid of the photodiode number buttons | * Getting rid of the photodiode number buttons | ||
* Deleted all of the unimportant files (e.g. HTML, js, etc) from the folder (limbu) | |||
* Put detailed comments on the code that explains what it does which would be useful for the reader | |||
== August Schedule == | == August-September Schedule == | ||
* Will be back to my family in Doncaster from the 19th to 21st of August due to family reasons but I will still try to get some work done | |||
* Have to leave my current flat by the 31st of August (I will probably leave around the 28th) | |||
* In2research poster deadline on the 31st August | * In2research poster deadline on the 31st August | ||
* Graduation ceremony on the 1st September | * Graduation ceremony on the 1st September | ||
* Final date of the project is 2nd September | * Final date of the project is 2nd September |
Latest revision as of 17:33, 18 August 2022
Electronic Log for Unik Limbu
To Do
Add list of to-do list items
- Implementing a text-entry box for the number of photodiodes instead
- Implementing two text-entry boxes for the minimum (0mm) and maximum range which updates automatically when the number of photodiodes is entered
- The x-axis must show millimetres, not photodiode numbers because the important quantity is the Water Equivalent Thickness that the protons have penetrated
- Getting rid of the buttons that reload the plot and instead implement four check boxes on the plot
- Raw photodiode values
- Error bars
- Quenched Bragg curve
- Bortfeld curve
- Convert the Start and Stop buttons into a single button that changes role depending on whether the display is running or stopped
- If it's stopped: it should say "Run" and start the display running
- If it's running: it should say "Stop" and should stop or pause the display
Completed
- Understood and made use of Papa Parse to load the data
- Keep all the code in the same repository
- Learnt and understood about Version Control System (VCS) by watching videos and reading documentation on Git
- Tested using Git with VS Code and GitHub
- Use git commits to each stage of development of the code
- Clone the repository into the web directory so that all the code is the same
- Computing the photodiode intensity bar chart using the Papa Parse
- Adding axes to the photodiode intensity bar chart
- Getting rid of the photodiode number buttons
- Deleted all of the unimportant files (e.g. HTML, js, etc) from the folder (limbu)
- Put detailed comments on the code that explains what it does which would be useful for the reader
August-September Schedule
- Will be back to my family in Doncaster from the 19th to 21st of August due to family reasons but I will still try to get some work done
- Have to leave my current flat by the 31st of August (I will probably leave around the 28th)
- In2research poster deadline on the 31st August
- Graduation ceremony on the 1st September
- Final date of the project is 2nd September