ELogs/JoeBateman: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
(Created page with "== To Do == === MC Simulations === === Fibres ===")
 
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:


=== MC Simulations ===
=== MC Simulations ===
* Modify ProtonGB and/or ProtonSB Geant4 examples to start doing 3D dose reconstruction from UCLH beam test
** Need to modify output so that it goes dose in 3D voxels as opposed to integrated z-axis and lateral mesh.
*** Voxel size? Same as TPS or larger?
** Distance from source to water phantom and size ion water phantom.
** No. of histories per beamlet and no. of repeats per beamlet.
* Eventually compare QuADProBe MC simulation to that reconstructed from TPS/DICOM values or TPS dose distribution using Gamma pass rate.
* After successful reconstruction with Geant4 start looking into FRED-MC download and using HEP GPU.


=== Fibres ===
=== Fibres ===
* Reconstruct Raffy's setup in our lab using the NI, zybo and photodiodes (without the fibre array)
* Consider potential ways of calibrating fibre to PD coupling.
=== Conference Abstracts ===
* PTCOG - due 16/12 - schedule meeting with Ilaria & co to discuss?
* PPRIG - due 31/12
=== Papers ===

Latest revision as of 15:31, 4 November 2024

To Do

MC Simulations

  • Modify ProtonGB and/or ProtonSB Geant4 examples to start doing 3D dose reconstruction from UCLH beam test
    • Need to modify output so that it goes dose in 3D voxels as opposed to integrated z-axis and lateral mesh.
      • Voxel size? Same as TPS or larger?
    • Distance from source to water phantom and size ion water phantom.
    • No. of histories per beamlet and no. of repeats per beamlet.
  • Eventually compare QuADProBe MC simulation to that reconstructed from TPS/DICOM values or TPS dose distribution using Gamma pass rate.
  • After successful reconstruction with Geant4 start looking into FRED-MC download and using HEP GPU.

Fibres

  • Reconstruct Raffy's setup in our lab using the NI, zybo and photodiodes (without the fibre array)
  • Consider potential ways of calibrating fibre to PD coupling.

Conference Abstracts

  • PTCOG - due 16/12 - schedule meeting with Ilaria & co to discuss?
  • PPRIG - due 31/12

Papers