Proton Calorimetry/Meetings/2021/09/29: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
(Created page with "== Minutes for UCL Proton Calorimetry Meetings, 15th September == === Present === '''Simon Jolly''', '''Saad Shaikh''', '''Jeremy Ocampo''' === [[ELogs/SaadShaikh|Saad Shaikh]...")
 
No edit summary
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Minutes for UCL Proton Calorimetry Meetings, 15th September ==
== Minutes for UCL Proton Calorimetry Meetings, 29th September ==


=== Present ===
=== Present ===
Line 6: Line 6:


=== [[ELogs/SaadShaikh|Saad Shaikh]] ===
=== [[ELogs/SaadShaikh|Saad Shaikh]] ===
*
*Met with Raffy to discuss poster for IEEE NSS MIC
**Raffy to draft landscape version of poster and slides for video presentation.
**Will meet again to discuss recording of video.
*Raffy mentioned that we have a UV LED already, will look for it.
**Will take care not to dismantle detector after next UCLH beam in order to take calibration measurements with UV LED.
*Simon has heard back from Andy: UCLH beam test possible within next 1-2 months. Exact date TBC. Measurements to be made:
**Background & calibration
**Pencil beams, 70-110 MeV, 3 currents (high, low, very low)
**±5mm in x-y plane for given z
**Range steps, no x-y scanning (demo live fit)
***Will investigate behaviour of live fit when detector is seeing darkness. May require some gating feature.
**Box field treatment plan
**Steer beam towards photodiodes(?)
*Will test experimental setup next week. CMOS sensor to not be used.
*Beam test at Clatterbridge likely to not happen until new year.
*Fern has provided headless Pi, will take home to test.
**Probably easiest to SSH from Mac when using it, requires static IP address.
*Looking into multi-threading for live fitting.
*Brief investigation into executing bash commands from webpage, [https://stackoverflow.com/questions/6235785/run-a-shell-script-with-an-html-button this forum post] may be useful.
*Discussed first version of Connor's stack design:
**Main issue is providing enough support for sheets of different sizes.
**Current method would require entire detector recalibration if a module is removed.
**Is there a way of securing 32 sheets in a gapless holder?
**Will reconvene with Connor to discuss feedback.
*Will meet with Marko and Clive tomorrow to discuss Rev C design.

Latest revision as of 11:22, 7 October 2021

Minutes for UCL Proton Calorimetry Meetings, 29th September

Present

Simon Jolly, Saad Shaikh, Jeremy Ocampo

Saad Shaikh

  • Met with Raffy to discuss poster for IEEE NSS MIC
    • Raffy to draft landscape version of poster and slides for video presentation.
    • Will meet again to discuss recording of video.
  • Raffy mentioned that we have a UV LED already, will look for it.
    • Will take care not to dismantle detector after next UCLH beam in order to take calibration measurements with UV LED.
  • Simon has heard back from Andy: UCLH beam test possible within next 1-2 months. Exact date TBC. Measurements to be made:
    • Background & calibration
    • Pencil beams, 70-110 MeV, 3 currents (high, low, very low)
    • ±5mm in x-y plane for given z
    • Range steps, no x-y scanning (demo live fit)
      • Will investigate behaviour of live fit when detector is seeing darkness. May require some gating feature.
    • Box field treatment plan
    • Steer beam towards photodiodes(?)
  • Will test experimental setup next week. CMOS sensor to not be used.
  • Beam test at Clatterbridge likely to not happen until new year.
  • Fern has provided headless Pi, will take home to test.
    • Probably easiest to SSH from Mac when using it, requires static IP address.
  • Looking into multi-threading for live fitting.
  • Brief investigation into executing bash commands from webpage, this forum post may be useful.
  • Discussed first version of Connor's stack design:
    • Main issue is providing enough support for sheets of different sizes.
    • Current method would require entire detector recalibration if a module is removed.
    • Is there a way of securing 32 sheets in a gapless holder?
    • Will reconvene with Connor to discuss feedback.
  • Will meet with Marko and Clive tomorrow to discuss Rev C design.